Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | L1 | Accepted-Finance ok | |
| 2 | L2₹8.9 L+₹38,695.74 (4.56%)Accepted-Finance | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | M ELUMALAI L1 | Sri sarva Enterprise L2 |
|---|---|---|---|---|---|
| 1.001.Construction of New Kitchen Shed at Pappanchathiran PUMS in Chembarambakkam Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 33.22 | cum | 240 ₹7,973 | 200 ₹6,644 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 5 | cum | 1,750 ₹8,750 Lowest | 2,000 ₹10,000 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials to site and labour charges etc completed. | 5 | cum | 5,300 ₹26,500 Lowest | 5,500 ₹27,500 |
| 5.00 | Brick work in CM 1:5 mix using Country bricks including cost and conveyence of all materials to site and labour charges etc completed. | 5.98 | cum | 5,900 ₹35,282 | 5,000 ₹29,900 Lowest |
| 6.00 | Above level | 29 | cum | 6,000 ₹1,74,000 | 5,400 ₹1,56,600 Lowest |
| 7.00 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 0.9 | MT | 89,000 ₹80,100 | 110 ₹99 Lowest |
| 8.00 | Cost towards supply centering with planks including all cost and conveyance charges | 28.44 | sqm | 500 ₹14,220 Lowest | 1,200 ₹34,128 |
| 9.00 | Above level | 45 | sqm | 1,000 ₹45,000 Lowest | 1,200 ₹54,000 |
| 10.00 | Reinforced Cement concrete 1: 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 6 | cum | 9,000 ₹54,000 | 6,500 ₹39,000 Lowest |
Tender Value
₹9.3 L
EMD Value
₹10,000
Closing Date
24 Sept 2026, 3:00 pmClosed
Block Development office BP
Poonamallee union
Contruction f New kitchen shed at Pappanchathiran PUMS in Chembarambakkam Panchayat
2026_RDTN_702454_1
1071/2025/A2 PME CSR -01
Open Tender
Civil Works
Works
Poonamallee
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
Block Development office BP
16 Oct 2026
8 Sept 2026
24 Sept 2026
8 Sept 2026
24 Sept 2026
8 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of New Kitchen Shed at Pappanchathiran PUMS in Chembarambakkam Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 33.22 | cum | 263.78 | ₹8,762.77 |
| 3 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 5 | cum | 1,950.46 | ₹9,752.3 |
| 4 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials to site and labour charges etc completed. | 5 | cum | 5,636.63 | ₹28,183.15 |
| 5 | Brick work in CM 1:5 mix using Country bricks including cost and conveyence of all materials to site and labour charges etc completed. | 5.98 | cum | 6,133.27 | ₹36,676.95 |
| 6 | Above level | 29 | cum | 6,226.14 | ₹1,80,558.06 |
| 7 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 0.9 | MT | 91,880.58 | ₹82,692.52 |
| 8 | Cost towards supply centering with planks including all cost and conveyance charges | 28.44 | sqm | 547.5 | ₹15,570.9 |
| 9 | Above level | 45 | sqm | 1,095 | ₹49,275 |
| 10 | Reinforced Cement concrete 1: 1.5 : 3 mix using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 6 | cum | 9,364.27 | ₹56,185.62 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_844435.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tenderdocument.pdf
Tender Documents • 0.59 MB
BOQ_844435.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .