Tender Value
₹62.6 L
EMD Value
₹1.3 L
Closing Date
1 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TELE
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less: where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Definition of Similar Work:" Any Telecom work".
23 conditions · 10 needing a document upload
Before submitting tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract-2022, for the completion of works to the entire satisfaction of the Engineer.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act 2017 (CGST)/Integrated Goods and Services Tax Act 2017 (IGST)/ Union Territory Goods and Services Tax Act 2017 (UTGST)/ respective State's State Goods and Services Tax ACT (SGST) also, as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding. Tenders will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to Railway immediately after the award of contract , without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority .
In case successful tenderer is not liable to be registered under GST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his / their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per the instructions given in Tender Document which is attached with the tender.
S&T work in connection with (A) Construction of 2 units Type-V Quarters on replacement basis of old Bungalow No.413 & 434 in Nambari officer colony, Maligaon. (B) Construction of 2 units Type-V Quarters on replacement basis of old Bungalow No.414 & 415 in Nambari officer colony, Maligaon. (C) Construction of 2 units Type-V Quarters on replacement basis of old Bungalow No.416 & 417 in Nambari officer colony, Maligaon. (D) New construction of 02 units Type-V Quarters in Nambari officer colony, Maligaon.(E) Construction of 2 units VI Quarters in Nambari officer colony, Maligaon.
N-2026-27-02RT-DyCSTE-NW~NFR
N-2026-27-02RT-DyCSTE-NW
Open
Works - General
180 Days
Kamrup, Assam
₹0
₹1.3 L
1 Jul 2026
9 Jun 2026
17 Jun 2026
108 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,16,962 | ||
| — | 30.00 | — | — | ||
| Supply of GPON ONT Device for End User Premises having 1GE+1FE+1POTS+WIFI AC (Support 2.4Ghz and 5GHz) and designed for fulfilling FTTH. It should be fully compliant with technical regulations such as IEEE802.3ah and technical requirement of GPON as per TS-A1. | — | — | — | 1,04,370 | |
| — | 3400.00 | — | — | ||
| Supply of 2 core Optical Fibre Cable (Unarmoured) for end user connectivity from splitter as per TS-A2. | — | — | — | 27,200 | |
| — | 18.00 | — | — | ||
| Supply of PLC splitter for Optical Power Splitter on edge having ratio 2:2/2:4/2:8/1:8 as per site requirement as per TS-A3. | — | — | — | 17,406 | |
| — | 26.00 | — | — | ||
| Supply of Joint Closure Box (Mini) for joining of OFC at user end as per TS. (Pack of 2 Joint Closure Box ) TS-A4. | — | — | — | 4,238 | |
| — | 24.00 | — | — | ||
| Supply of Joint Closure Box for midway joining of OFC as per TS-A5. | — | — | — | 2,376 | |
| — | 26.00 | — | — | ||
| Supply of Joint Closure Box (2 ports) for ONT with dust-proof device to prevent dust from entering fibre optic panels as per TS-A6. | — | — | — | 12,896 | |
| — | 52.00 | — | — | ||
| Supply of Simplex Single Mode Optical Fibre Patch Cord (5 Meter, SC/APC to SC/APC) as per TS-A7. | — | — | — | 13,000 | |
| — | 36.00 | — | — | ||
| Splicing of OFC as per TS-A8. | — | — | — | 3,600 | |
| — | 14.00 | — | — | ||
| Supply of Cat-6 UTP cable roll/box of approx 305 mtr as per TS-A9. | — | — | — | 1,13,596 | |
| — | 360.00 | — | — | ||
| — | 70.00 | — | — | ||
| — | 130.00 | — | — | ||
| — | — | — | 780 | ||
| — | 5000.00 | — | — | ||
| Supply of 12 core single mode armoured OFC as per TS-A13. | — | — | — | 1,80,000 | |
| — | 3000.00 | — | — | ||
| Over Head OFC laying as per TS-A14. | — | — | — | 54,000 | |
| — | 200.00 | — | — | ||
| Supply of Ceramics cup for passing the fibre through its hole and to tie with electrical pole wherever required as per TS-A15. | — | — | — | 2,000 | |
| — | 30.00 | — | — | ||
| Supply of Tie for Ceramic Cup used to hold the fibre as support while laying fibre overhead (Set/Packet of 100 pieces)TS-A16. | — | — | — | 5,640 | |
| — | 8.00 | — | — | ||
| Installation, testing & commissioning of the FTTH equipment as per TS-A17. | — | — | — | 48,000 | |
| — | — | — | 37,94,464 | ||
| — | 3000.00 | — | — | ||
| Trenching in normal soil to a depth of 1.2 metre and 300 mm wide and backfilling after laying of PIJF/OFC / pipe /duct as per technical specification TS-B1. | — | — | — | 1,23,000 | |
| — | 520.00 | — | — | ||
| Digging, laying & Covering of PIJF/OFC cable including supply of all materials for cable laying in Road/Culvert/Concrete area crossing including GI Pipes by Micro tunnelling process as per site requirement as given in TS-B2. | — | — | — | 3,07,320 | |
| — | 3400.00 | — | — | ||
| Supply of 10 pair PVC insulated cable of copper conductor, size 0.5 mm dia as per TS-B3. | — | — | — | 3,91,000 | |
| — | 3700.00 | — | — | ||
| Supply of 20 pair PVC insulated cable of copper conductor, size 0.5 mm dia as per TS-B4. | — | — | — | 8,58,400 | |
| — | 1060.00 | — | — | ||
| Supply of 10 pair krone module as per TS-B5. | — | — | — | 3,14,820 | |
| — | — | — | 2,04,560 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .