| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹2.0 CrAccepted-Finance | ₹2.0 Cr | Ist | Accepted-Finance L-1 Bidder |
| 2 | IInd₹2.0 CrRejected-Finance | ₹2.0 Cr | IInd | Rejected-Finance L-2 Bidder |
| 3 | IIIrd₹2.1 CrRejected-Finance | ₹2.1 Cr | IIIrd | Rejected-Finance L-3 Bidder |
| 4 | IV th₹2.1 CrRejected-Finance | ₹2.1 Cr | IV th | Rejected-Finance L-4 Bidder |
Tender Value
₹2.7 Cr
EMD Value
₹3 L
Closing Date
11 Apr 2024, 12:00 pmClosed
SE, ETC-I, Varanasi
Bhikharipur, DLW, Varanasi
PROCUREMENT AND WORK FOR DIVERSION OF 220 KV S/C SAHUPURI-KARAMNASA (NEW) LINE DUE TO INFRINGIMENT IN PROPOSED RAIL FLYOVER
2024_UPTCL_902827_2
E-Tender no. 62/2023-24/ETC-I/VNS
Open Tender
Electrical Works
Item Rate
90 days
UNDER ELECTRICITY TRANSMISSION DIVISION-III, SAHUP
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹2,950
SE ETC-VARANASI
₹3 L
26 Jul 2024
28 Mar 2024
12 Apr 2024
28 Mar 2024
11 Apr 2024
1 Apr 2024
Amount
Following Material will be supplied for the diversion of 220 KV S/C Sahupuri-Karamnasa (new) line due to infringment in proposed Rail fly over (DFCC)
Number Plate
Danger Plate
Phase Plate (in R, Y, B Set)
Bird Guard
Pipe Earthing Material
Hanger @4.95KG/No.
Anti climbing device
Vibration damper for Zebra conductor
M.S.joint for Zebra conductor
Repair sleeve for Zebra conductor
PA Rod for Zebra conductor
Single Suspension fitting for Zebra conductor
Single tension fitting for Zebra conductor
Double tension fitting for Zebra conductor
220 KV, 70 KN Polymer Insulators
220 KV, 160 KN Polymer Insulators
Suspension fitting for 7/9 SWG Earthwire
Tension fitting 7/9 SWG Earthwire
M.S. joint with steet joint 7/9 SWG Earthwire
Vibration damper for7 /9 SWG Earthwire
Copper bond
Following works will be carried out for the diversion of 220 KV S/C Sahupuri-Karamnasa (new) line due to infringement in proposed Rail fly over (DFCC)
Check survey and final peg marking for 220 KV S/C Sahupuri-Karamnasa (new) S/C Line.
Detail survey including prepration of schedule of material, marking of location, survey of line with co-ordinates of each tower
Soil Testing
Cost of excavation of 220 KV tower foundation pits including all earth work , back filling and leveling etc.
Setting of stub including all foundation work but excluding the cost of concreting and excavation.
220 KV D/C DA+0/5 Type
220 KV D/C DB+0/5 Type
220 KV D/C DC+10/15 Type
Cost of concreting work in 1:2:4 ratio of cement, sand and agreegate for all type of 220 KV D/C towers including cost of all material ,dewatering shoring and shuttering, curing etc.
Cost of rainforcement of steel bar in R.C.C Foundation including cutting and bedding etc.
Erection of super structure of 220 KV D/C type tower including all work above ground level , fitting of danger plate, number plate, phase plate, bird guard etc. including shifting of tower parts and accessories from store to site.
Laying stringing, tensioning, clamping, jointing etc of 3 Phase ACSR Zebra conductor. Including hoisting of insulators , fittings of all necessary hardwares and all accessories on all three phases of 220 KV SC Line including shifting of all these materials from store to site.
Laying stringing, tensioning, clamping, jointing etc one earth wire including fitting of all accessories and shifting of these materials from store to site.
Grounding work including earthwork etc for Pipe type grounding including cost of coke & salt. The work also includes carriage of material from the store to the site.
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground levvel whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint of the affected surface including cost of all material including tack welding of river crossing tower & Anchor towers.
De-stringing of 1 No. earth wire safely from tower No- 78 (A+0) to proposed tower No- 83 (DD+0) Rerolling of earthwire on empty drum and carriage of material return to department.
Destringing of ACSR Zebra/Deer conductor of all the 3 phases safely from tower No- 78 (A+0) to proposed tower No- 83 (DD+0) this work includes taking out suspension/tension fitting, disc insulator from tower, opening of PA rod etc and carriage of material return to department.
Dismantling of existing tower No- 81,82,83 & 84 all A+0 type tower from peak to stub level and proper stacking of dismantled tower part at working site and carriage of material return to department.
Carriage of dismatalled tower material, old conductor, nut & bolt, fittings & hardware, insulators etc from site to store at Sahupuri or other S/S under ETD-III, Sahupuri by private vehicle including its loading and unloading at respective places. Distance approx 15 KM.
Breaking of chimney of all the four legs of existing tower No- 81,82,83 & 84 with the help of electric drill machie 2 mtr. below the ground level, then cutting of existing stub and back filling of earth.
Procurement & work for diversion of 132 KV D/C Sahupuri-Chandauli/ Karamnasa line Due to infringement in proposed Rail Flyover (DFCC)
Number Plate
Danger Plate
Phase Plate (in R, Y, B Set)
Bird Guard
Pipe Earthing Material
Anti climbing device for panther conductor
Vibration damper for panther conductor
M.S.joint wth steet joint for panther conductor
Repair sleeve for panther conductor
PA Rod for panther conductor
Single Suspension fitting for panther conductor
Single tension fitting for panther conductor
Double tension fitting for panther conductor
132 KV, 70 KN Poymer insulator
132 KV, 120 KN Poymer insulator
Suspension fitting for 7/10 SWG Earthwire
Tension fitting for 7/10 SWG Earthwire
M.S.joint with steet joint for 7/10 SWG Earthwire
Vibration damper for 7/10 SWG Earthwire
Copper bond for 7/10 SWG Earthwire
Following works will be carried out for the diversion of 132 KV D/C Sahupuri-Chandauli/Karamnasa line.
Check survey and final peg marking for 132 KV D/C Sahupuri-Chandauli/ Karamnasa D/C Line.
Detail survey including prepration of schedule of material, marking of location, survey of line with co-ordinates of each tower
Soil Testing
Cost of excavation of 132 KV tower foundation pits including all earth work , back filling and leveling etc.
Setting of stub including all foundation work but excluding the cost of concreting and eexcavation.
132 KV D/C DB+0/5 Type
132 KV D/C DC+10/15 Type
Cost of concreting work in 1:2:4 ratio of cement, sand and agreegate for all type of 132 KV D/C towers including cost of all material ,dewatering shoring and shuttering, curing etc.
Cost of rainforcement of steel bar in R.C.C Foundation including cutting and bedding etc.
Erection of super structure of 132 KV D/C type tower including all work above ground level , fitting of danger plate, number plate, phase plate, bird guard etc. including shifting of tower parts and accessories from store to site.
Laying stringing, tensioning, clamping, jointing etc of 6 phase ACSR Panther conductor. Including hoisting of insulators , fittings of all necessary hardwares and all accessories on all three phases of 132 KV DC Line including shifting of all these materials from store to site.
Laying stringing, tensioning, clamping, jointing etc one earth wire including fitting of all accessories and shifting of these materials from store to site.
Earthing of towers including earth work for pipe type grounding.
Tack welding of all the bolts up to the hight of one section or 15 meter whichever is more of tower as per technical specification.
De-stringing of 1 No. earth wire safely from tower No- 78 (A+0) to proposed tower No- 82 (A+0) Rerolling of earthwire on empty drum and carriage of material return to department.
Destringing of ACSR Panther conductor of all the 6 phases safely from tower No- 78 (A+0) to proposed tower No- 82 (A+0) this work includes taking out suspension/tension fitting, disc insulator from tower, opening of PA rod etc and carriage of material return to department.
Dismantling of existing tower No- 79,80,81 & 82 all DA+0 type tower from peak to stub level and proper stacking of dismantled tower part at working site and carriage of material return to department.
Carriage of dismatalled tower material, old conductor, nut & bolt, fittings & hardware, insulators etc from site to store at Chandauli or other S/S under ETD-III, Sahupuri by private vehicle including its loading and unloading at respective places. Distance approx 30 KM.
Breaking of chimney of all the four legs of existing tower No- 8,9,10,15 & 16 with the help of electric drill machine 1 mtr. below the ground level, then cutting of existing stub and back filling of earth.
Procurement of Material for construction of 220 KV Sahupuri-Obra D/C line for DFCC Under ETD-III, Sahupuri
ACCESSORIES
Tower Accessories as UPPTCL Standard
Number Plate
Danger plate
Phase Plate
Earthing material Pipe type
Circuit Plate
Conductor Accessories Suitable for ACSR ZEBRA as per
Vibration Dampers
Mid Span compression Joint
Repair sleeves
Hardwares & Insulator Accessories for Conductor
SINGLE TENSION FTTG
DOUBLE TENSION.FTTG
INSULATORS 160 K.N.
OPGW Accessories
Joint Box
Supply of OPGW
48 Fibre(DWSM) OPGW Fibre Optic Cable
Supply and Installation of Hardware set for 48 Fibre OPGW
Erection work for construction of 220 KV Sahupuri-Obra D/C line for DFCC Under ETD-III, Sahupuri
Details survey of following line due to infrengement in aligment of proposed DFCCIL DDU-VYAS Rail Fly over .This work includes route alingement of proposed, preparation of profile, tower schedule, schedule of materials, marking of location (Route length), GPS survey of line, with co-ordinates of each tower (length of the line shall be authenticated by GPS Survey). All NOCs (Safety, NHAI, Railway etc.) required for erection/charging of the line has to obtain by the contractor and all ROW has to solve by the contractor including collecting of forms, completion of all required documuntations, submission in triplicate to respective offices including clearance from revenue department/Safety Department has to be done by the firm.
Check Survey
Soil investigation (All kind of Soil)
Cost of excavation of 220 KV tower foundation pits including all earth work, backfilling leveling etc.
Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers. The work also includes carriage of material from the store to the site.
STUB-SETTING(220 KV B Multi Zebra)
STUB-SETTING(220 KV D Multi Zebra)
Cost of concreting of all type of tower foundation including cost of cement, dewatering, shoring and shuttering, forming, curring but excluding cost of reinforcement bars
1:2:4 concreting
Erection of superstructure of 220KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger numer, phase plates, bird guard and fixing & punching for 220 KV SC/DC lines names. The work also includes carriage of material from the store to the site.
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground levvel whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint of the affected surface including cost of all material including tack welding of river crossing tower & Anchor towers.
Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting bending placing dinding etc.
Laying, stringing, tensioning clamping, jointing etc of ACSR 'ZEBRA' conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting Armour rods, vibration dampers etc, on all Six phases of 220 KV DC Lines . The work also includes carriage of material from the store to the site, identification of LT lines and shut down clearances from discom.
Laying, stringing, tensioning, clamping, jointing including fitting of all necessary Hardware and accessories of OPGW& OFAC, termination at S/S ,end to end connectivity& testing etc. on 220 KV Lines. The work also includes carriage of material from the store to the site, identification of LT lines and shut down clearances from discom.
Grounding work including earthwork etc for Pipe type grounding including cost of coke & salt. The work also includes carriage of material from the store to the site.
Erection, Testing, commissioning of FOTE & integration with existing fibre optic network of UPPTCL
Erection Testing, Commissioning of Network Management System in the presence of microwave team and getting certified with the team also.
De-stringing of OPGW safely from tower No- 314,313 & 312 Rerolling of OPGW on empty drum and carriage of material return to department.
Dismantling of all 3 phases of existing ACSR Zebra , all Hardware fittings & conductor accessories e.g. armour rod, vibration dampers, insulator strings etc. of existing line and re-rolling of dismantled conductor on empty drums for re-use, safely transportation of all removed material to UPPTCL stores.
Dismantling of existing tower No- 314,313 & 312 all type tower from peak to stub level and proper stacking of dismantled tower part at working site and carriage of material return to department.
Carriage of dismatalled tower material, old conductor, nut & bolt, fittings & hardware, insulators etc from site to store at Sahupuri or other S/S under ETD-III, Sahupuri by private vehicle including its loading and unloading at respective places. Distance approx 5 KM.
Breaking of chimney of all the four legs of existing tower No- 314,313 & 312 with the help of electric drill machine 1 mtr. below the ground level, then cutting of existing stub and back filling of earth.
Umawala Engineers Pvt. Ltd.
shiv shankar enterprises
M/S SHEKHAR ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .