Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC AT ARGADA DISTT RAMGARH JHARKHAND | L1 | Accepted-AOC Accepted as L1 as per NIT | |
| 2 | L2₹5.7 L+₹46,300 (8.80%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Rejected-Finance Rejected as L2 as per NIT | |
| 3 | L3₹8.2 L+₹3.0 L (56.6%)Rejected-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L3 | Rejected-Finance Rejected as L3 as per NIT | |
| 4 | L4₹8.7 L+₹3.4 L (65.2%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L4 | Rejected-Finance Rejected as L4 as per NIT |
| Sl No | Description | Qty | Unit | CENTRAL ENGINEERS L2 | M/S ADITYA ENTERPRISES L3 | coalfields engineering works L4 | Maa Katyayani Enterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | A. Repairing of 01 no. 630KVA, 3.3KV/440V K-Sambhav make- with Sl. No. KTC/Tr/630/12 (put zero against this row in rate column) | 1 | Job | - | - | - | - |
| 1.01 | Cost of copper wire strip (after less scrap) | 180 | Kg | 1,100 ₹1,98,000 | 1,117.8 ₹2,01,204 | 1,179 ₹2,12,220 | 840 ₹1,51,200 Lowest |
| 1.02 | Cost of insulating material | 1 | No | 25,000 ₹25,000 Lowest | 75,451.5 ₹75,451.5 | 79,582.5 ₹79,582.5 | 56,700 ₹56,700 |
| 1.03 | Cost of Labour charges | 1 | No | 25,000 ₹25,000 Lowest | 75,451.5 ₹75,451.5 | 79,582.5 ₹79,582.5 | 56,700 ₹56,700 |
| 1.04 | Cost of bushing insulator with studs | 3 | No | 3,400 ₹10,200 Lowest | 6,910 ₹20,730 | 7,300 ₹21,900 | 5,360 ₹16,080 |
| 1.05 | Costof gasket with cork-sheet | 2 | No | 1,350 ₹2,700 Lowest | 1,835 ₹3,670 | 1,940 ₹3,880 | 1,450 ₹2,900 |
| 2.00 | B. Repairing of 01 no. 500KVA, 11KV/440V GEC make- with Sl. No. 22426418 (put zero against this row in rate column) | 1 | Job | - | - | - | - |
| 2.01 | Cost of copper wire strip (after less scrap) | 152 | Kg | 1,100 ₹1,67,200 | 1,117.8 ₹1,69,905.6 | 1,179 ₹1,79,208 | 840 ₹1,27,680 Lowest |
| 2.02 | Cost of insulating material | 1 | No | 22,000 ₹22,000 Lowest | 63,714.6 ₹63,714.6 | 67,203 ₹67,203 | 47,880 ₹47,880 |
| 2.03 | Cost of Labour charges | 1 | No | 22,000 ₹22,000 Lowest | 63,714.6 ₹63,714.6 | 67,203 ₹67,203 | 47,880 ₹47,880 |
Tender Value
Refer Docs
EMD Value
₹9,600
Closing Date
1 Jul 2025, 4:00 pmClosed
Project Engineer (EnM), Kathara Colliery
P.E. (EnM), Office of the PO, Kathara Colliery
Complete repairing and rewinding of (A) 01 no. 630KVA, 3.3KV/440V K-Sambhav Make, with sl. No. KTC/Tr/630/12 and (B) 01 no. 500KVA, 11KV/440V GEC Make with sl. No. 22426418 oil cooled transformer for colony power supply under Kathara Colliery.
2025_CCL_337991_1
KTC/PE (EnM)/E-Tender/25-26/15
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
P.E. (EnM), Office of the PO, Kathara Colliery
As per NIT
6 documents required · 6 mandatory
₹9,600
Yes
13 Sept 2025
20 Jun 2025
2 Jul 2025
21 Jun 2025
1 Jul 2025
21 Jun 2025
21 Jun 2025 - 28 Jun 2025
Amount
A. Repairing of 01 no. 630KVA, 3.3KV/440V K-Sambhav make- with Sl. No. KTC/Tr/630/12 (put zero against this row in rate column)
Cost of copper wire strip (after less scrap)
Cost of insulating material
Cost of Labour charges
Cost of bushing insulator with studs
Costof gasket with cork-sheet
B. Repairing of 01 no. 500KVA, 11KV/440V GEC make- with Sl. No. 22426418 (put zero against this row in rate column)
Cost of copper wire strip (after less scrap)
Cost of insulating material
Cost of Labour charges
Cost of bushing insulator with studs
Costof gasket with cork-sheet
Total impact of GST for the purpose of CTC
CENTRAL ENGINEERS (BID ID -1163680)
M/S ADITYA ENTERPRISES (BID ID -1164288)
coalfields engineering works (BID ID -1164341)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .