Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance DELHI EAST DELHI 110092 INDIA UDYAM DL 02 0018735 | EAST DELHI | DELHI | 110092 | L1 | Admitted-Finance | |
| 2 | L2₹1.7 L+₹7,802.72 (4.88%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Travionyx Technologies Private Limited L1 | Gupta Brothers L2 |
|---|---|---|---|---|---|
| 1.01 | Flushing/ Cleaning UGR of OHT Mayur Vihar Phase-I, Chilla DDA Flats BPS, 8 Block Trilokpuri BPS, Pkt IV BPS Mayur vihar phase I and Pkt V BPS Mayur Vihar Phase-I in AC-55. include following works: - Cleaning of underground sump, Over Head R.C.C. Tank independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations: - i) Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. ii) Entire surface area of the sump shall then have scrubbed thoroughly with wire brush etc. and pressure washed with water. (ili) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge. | 1,950.68 | SQM | 1,59,955.76 ₹1,59,955.76 Lowest | 0 ₹1,67,758.48 |
Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
6 Nov 2025, 3:00 pmClosed
Executive Engineer (EM) M-1
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Flushing/ Cleaning UGR of OHT Mayur Vihar Phase-I, Chilla DDA flats BPS, 8 Block Trilokpuri BPS, Pkt-IV BPS Mayur Vihar Phase-I and Pkt-V BPS Mayur Vihar Phase-I in AC-55.
2025_DJB_280562_25
NIT No-08 EE (EM) M-1/ (25-26)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹3,400
15 Nov 2025
1 Nov 2025
6 Nov 2025
1 Nov 2025
6 Nov 2025
1 Nov 2025
Flushing/ Cleaning UGR of OHT Mayur Vihar Phase-I, Chilla DDA Flats BPS, 8 Block Trilokpuri BPS, Pkt IV BPS Mayur vihar phase I and Pkt V BPS Mayur Vihar Phase-I in AC-55. include following works: - Cleaning of underground sump, Over Head R.C.C. Tank independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations: - i) Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. ii) Entire surface area of the sump shall then have scrubbed thoroughly with wire brush etc. and pressure washed with water. (ili) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge.
Gupta Brothers (BID ID -1635956)
Bidder Name
Gupta Brothers
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_370449.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .