Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 63 RANITALA BRINDABAN LANE BRINDABAN LANE VILLAGE TOWN KULTI CITY KULTI PASCHIM BARDHAMAN WEST BENGAL 713343 INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance CHHORA MORE HARIPUR BAHULA BARDHAMAN 713322 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHMAN | WEST BENGAL | 713322 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹10,200
Closing Date
12 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager, Kunustoria Area
Office of the General Manager, Kunustoria Area, P.O- Toposi, Pin-713362, Paschim bardhaman, West bengal
Partial Supply and Installation of 90 KW Belt Conveyor system at B-6 Panel of Bogra Seam (R-VI) of Amritnagar Colliery under Kunustoria Area.
2024_ECL_319655_1
ECL/GMKNT/EnM/eTen/24-25/ 09dt17.10.2021
Open Tender
Miscellaneous Works
Item Rate
30 days
Amritnagar Colliery, ECL
As per NIT
4 documents required · 4 mandatory
₹10,200
13 Nov 2024
25 Oct 2024
13 Nov 2024
25 Oct 2024
12 Nov 2024
26 Oct 2024
26 Oct 2024 - 1 Nov 2024
Amount
New fabrication of 2 nos of load table(hopper) Skilled labour
New fabrication of 2 nos of load table(hopper) Semi Skilled labour
New fabrication of structure for discharge point. Skilled labour
New fabrication of structure for discharge point, Semi Skilled labour
Dismantling and lifting of following materials to surface from underground at different unit- Base frame, Foot mounted gear box, Drive drum(650 dia), Equalizing gear(1set), P/Block with bearing set , Discharge drum(550 dia), Loop take up drum (550dia), Deflector drum (400 dia), Snub drum – 500 KG, Motor 90 KW – 1000KG, Jib head (for discharge belt drum structure) – 650 KG, Skid mounted tail end structure, Conveyor structure (125mm runner) etc. Skilled labour
Dismantling and lifting of following materials to surface from underground at different unit- Base frame, Foot mounted gear box, Drive drum(650 dia), Equalizing gear(1set), P/Block with bearing set , Discharge drum(550 dia), Loop take up drum (550dia), Deflector drum (400 dia), Snub drum – 500 KG, Motor 90 KW – 1000KG, Jib head (for discharge belt drum structure) – 650 KG, Skid mounted tail end structure, Conveyor structure (125mm runner) etc. semi Skilled labour
Carrying, transportation and installation with fitting from 3No. Pit Top to installation site Base frame, Foot mounted gear box, Drive drum(650 dia), Equalizing gear(1set), P/Block with bearing set , Discharge drum(550 dia), Loop take up drum (550dia), Deflector drum (400 dia), Snub drum – 500 KG, Motor 90 KW – 1000KG, Jib head (for discharge belt drum structure) – 650 KG, Skid mounted tail end structure, Conveyor structure (125mm runner) with top & bottom roller etc. Skilled labour
Carrying, transportation and installation with fitting from 3No. Pit Top to installation site Base frame, Foot mounted gear box, Drive drum(650 dia), Equalizing gear(1set), P/Block with bearing set , Discharge drum(550 dia), Loop take up drum (550dia), Deflector drum (400 dia), Snub drum – 500 KG, Motor 90 KW – 1000KG, Jib head (for discharge belt drum structure) – 650 KG, Skid mounted tail end structure, Conveyor structure (125mm runner) with top & bottom roller etc.semi Skilled labour
Transportation and lapping with joint, tensioning, trail run etc(1000 Mtr. PVC belt) Skilled labour
Transportation and lapping with joint, tensioning, trail run etc(1000 Mtr. PVC belt) semi Skilled labour
Foundation of down holding bolts of drive unit, discharge base frame & tail end etc. Skilled labour
Foundation of down holding bolts of drive unit, discharge base frame & tail end etc. semi Skilled labour
Drive & tail end fencing [complete fabrication & fitting] Skilled labour
Drive & tail end fencing [complete fabrication & fitting] semi Skilled labour
Drive base frame & discharge base frame cement concrete including materials. (66 X 126 X 14 Base frame cement concrete) (2 X 2 X 26 - 4 nos. column discharge cement concrete) Skilled labour
Drive base frame & discharge base frame cement concrete including materials. (66 X 126 X 14 Base frame cement concrete) (2 X 2 X 26 - 4 nos. column discharge cement concrete) semi Skilled labour
PROFIT @10%
Supply of bearing (22234C)
Supply of bearing (22228K)
Supply of bearing (22217K)
Supply of plummer block (SN-528)
Supply of plumber bearing block (SN-520)
Supply of Sleeve (H317)
Supply of Sleeve (H328)
Supply of Sleeve (H320)
Supply of bearing (22220K)
Coupling complete set with Tyre F-120, pilot bore (40mm)
Supply of Bolts & Nut for conveyor structure fitting.. i) 500 Mter long X 1.25 Kg = 625 KG ii) Drive Unit = 25 KG iii) Discharge unit = 20 KG iv) Load table and tail end = 40 KG Total = 710 KG
Total impact of GST for the purpose of CTC
KARMAKAR ENGINEERING WORKS (BID ID -1097250)
finance_331338.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .