Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹18.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹18.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹18.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹18.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹18.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.7 L
EMD Value
₹18,700
Closing Date
3 Jul 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Construction of Community Centre inside Ward Office Campus at T.V. Centre road in Ward No. 9.
2026_ORULB_132393_1
MC(CMC)CTC_Div-I_No.6/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹18,700
Yes
7 Jul 2026
22 Jun 2026
7 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in all kinds of soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulders | 10.8 | cum | 299.52 | ₹3,234.82 |
| 2 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming | 1.08 | cum | 612.7 | ₹661.72 |
| 3 | Providing & laying cement concrete of prop. (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality | 1.08 | cum | 6,393.8 | ₹6,905.3 |
| 4 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes, Centring & Shuttering of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position.A) Column footing | 1.75 | cum | 6,925.12 | ₹12,118.96 |
| 5 | B) R.C.C. LINTELS | 1.26 | cum | 16,317.97 | ₹20,560.64 |
| 6 | C) R.C.C. BEAM & COLUMN | 15.52 | cum | 21,128.22 | ₹3,27,909.97 |
| 7 | D) R.C.C. ROOF SLAB | 10.35 | cum | 15,819.46 | ₹1,63,731.41 |
| 8 | E) R.C.C. CHAJJA | 3.38 | sqm | 1,439.8 | ₹4,866.52 |
| 9 | F) R.C.C. staire case | 1.75 | cum | 16,056.9 | ₹28,099.58 |
| 10 | G) Gread Beam | 0.78 | cum | 12,574.56 | ₹9,808.16 |
stage.html
html • 0.02 MB
finance_597351.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_597351.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .