| 1 | ₹25.6 LAWARDED | AWARDED |
Tender Value
₹24.4 L
EMD Value
₹25,000
Closing Date
5 Apr 2025, 9:30 pmClosed
Public Works Department
Construction of Bridge on SH Road 226 (NE 30)From NH-50 to Kallahalli road via Banavikallu, kenchobanahalli,Makanaduku,Chikkajogihalli,Siddapura,Hosahalli,Kanamadagu,Aluru,Kallahalli,Challakere boarder Road(near Hulikere Kodi KM.26.90) In Kudligi taluk,Vijayanagara Dist.(HOA 5054 APPENDIX E, SH BRIDGE IMPROVEMENTS) RESERVED FOR (CATOGERY-2A)
PWD/2024-25/BR/WORK_INDENT19508/CALL-2
PWD/2024-25/BR/WORK_INDENT19508/CALL-2
Reserved
Bridges/Culverts
Electronic Documents, First(One Cover)
PWD Division Office Hosapete
₹610
₹25,000
26 Mar 2025
26 Mar 2025
4 Apr 2025
Construction of Bridge on SH Road 226 (NE 30)From NH-50 to Kallahalli road via Banavikallu, kenchobanahalli,Makanaduku,Chikkajogihalli,Siddapura,Hosahalli,Kanamadagu,Aluru,Kallahalli,Challakere boarder Road(near Hulikere Kodi KM.26.90) In Kudligi taluk,Vijayanagara Dist.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and scaffolding wherever nece...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tyin...
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading,...
Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Wet Mix Macadam (Plant mix method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), c...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A Stone/Boul...
Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .