| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.3 Cr+₹2.8 L (0.31%)Admitted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | L2 | Admitted-Finance | ||
| 3 | L3₹10.9 Cr+₹1.6 Cr (17.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹12.0 Cr+₹2.7 Cr (29.2%)Admitted-Finance 63 USHA NAGAR EXTENSION INDORE | INDORE | INDORE | MADHYA PRADESH | L4 | Admitted-Finance | ||
| 5 | L5₹12.5 Cr+₹3.2 Cr (34.7%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
14 Sept 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. Chief Engg.,Water Resources Zone Udaipur
Addl. Chief Engg.,Water Resources Zone Udaipur
Construction of Anicut at Mandoor and Sukli River Block Dhariyawad District-Pratapgarh
2022_WRDAS_293581_1
10/2022-23 Dhariyawad Dn
Open Tender
Civil Works
Percentage
730 days
Dhariyawad
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Via Challan
₹25.8 L
Yes
Addl. Chief Engg.,Water Resources Zone Udaipur
12 Oct 2022
26 Aug 2022
15 Sept 2022
26 Aug 2022
14 Sept 2022
26 Aug 2022
8 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 5.1 PART -A EARTH WORK IN EXCAVATION
WORK TO BE EXECUTED BY MECHANICAL MEANS
5.1.1 Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect
5.1.1.02 Hard / dense soil | 2,917.77 | Cum | 93 | ₹2,71,352.61 |
| 2 | 5.1 PART -A EARTH WORK IN EXCAVATION
WORK TO BE EXECUTED BY MECHANICAL MEANS
5.1.1 Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect
5.1.1.03 Hard soil mixed with Kankar / boulders, Morrum | 2,917.77 | Cum | 115 | ₹3,35,543.55 |
| 3 | 5.1 PART -A EARTH WORK IN EXCAVATION
WORK TO BE EXECUTED BY MECHANICAL MEANS
5.1.2 Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
5.1.2.01 Soft / Disintegrated rock | 5,835.52 | Cum | 155 | ₹9,04,505.6 |
| 4 | 5.1 PART -A EARTH WORK IN EXCAVATION
WORK TO BE EXECUTED BY MECHANICAL MEANS
5.1.2 Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
5.1.2.02 Hard rock not requiring blasting | 5,835.52 | Cum | 229 | ₹13,36,334.08 |
| 5 | 5.1 PART -A EARTH WORK IN EXCAVATION
WORK TO BE EXECUTED BY MECHANICAL MEANS
5.1.2 Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
5.1.2.03 Phylite and other hard rock requiring nominal blasting | 5,835.52 | Cum | 321 | ₹18,73,201.92 |
| 6 | 5.1 PART -A EARTH WORK IN EXCAVATION
WORK TO BE EXECUTED BY MECHANICAL MEANS
5.1.2 Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
5.1.2.04 Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads and lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure and royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 5,835.52 | Cum | 439 | ₹25,61,793.28 |
| 7 | 9.8 Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto
9.8.3 40 mm | 3,515.24 | Cum | 4,896 | ₹1,72,10,615.04 |
| 8 | 9.2 Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto
(For mix design Cement content considered 400 kg/ cum of concrete)
9.2.4 20 mm | 7,460.16 | Cum | 6,236 | ₹4,65,21,557.76 |
| 9 | 10.1 Side shuttering including propping etc. complete (to achieve finish F 2 for :
10.1.2 Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | 24,508.14 | Sqm | 185 | ₹45,34,005.9 |
| 10 | 10.9.2 Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.
10.9.2.2 Tor or ribbed bars (IS :1786-1985) | 72,420.06 | Kg | 95 | ₹68,79,905.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 0.85 MB
TechnicalBidZoneNITNo10DWDdell.pdf
Tender Documents • 0.46 MB
FinBNITNo10itemDWDdell.pdf
Tender Documents • 1.70 MB
BOQ_521038.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .