Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAdmitted-Finance | ₹7.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.5 Cr+₹62.3 L (7.87%)Admitted-Finance | ₹8.5 Cr+₹62.3 L (7.87%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s VINOD KUMAR SHARMA L2 | P R Constructions L1 |
|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| 1.01 | Design and Build of tech building for E-MMS four storeyed (G+3) with permanent specifications, including RCC domestic water tank, fire fighting tank of 12600 litres in total at terrace and underground sump cum fire pump house of 50,000 litre capacity, ramp etc complete all as specified and shown on drawings. | 1 | Lump sum | 5,46,00,000 ₹5,46,00,000 | 5,09,00,000 ₹5,09,00,000 Lowest |
| 2.00 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 4,40,000 ₹4,40,000 Lowest | 4,50,000 ₹4,50,000 |
| 2.01 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 76,340.72 ₹76,340.72 Lowest | 81,000 ₹81,000 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 22,39,492 ₹22,39,492 | 20,09,119 ₹20,09,119 Lowest |
| 2.03 | Lump sum price worked out by the Contractor for “ROAD, PATH AND HARDSTANDING WORKS & CULVERT" as listed in Schedule ‘A’ Part V | 1 | Lump sum | 26,18,500 ₹26,18,500 Lowest | 27,15,837 ₹27,15,837 |
| 2.04 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part VI | 1 | Lump sum | 66,170 ₹66,170 Lowest | 67,000 ₹67,000 |
| 2.05 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part VII | 1 | Lump sum | 1,83,000 ₹1,83,000 | 1,55,743 ₹1,55,743 Lowest |
| 2.06 | Lump sum price worked out by the Contractor for “AREA DRAINAGE WORKS ” as listed in Schedule ‘A’ Part VIII | 1 | Lump sum | 6,02,300 ₹6,02,300 | 5,79,875 ₹5,79,875 Lowest |
| 2.07 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY WORKS” as listed in Schedule ‘A’ Part IX | 1 | Lump sum | 12,49,300 ₹12,49,300 Lowest | 12,52,727 ₹12,52,727 |
Tender Value
₹5.2 Cr
EMD Value
₹5.8 L
Closing Date
2 Jul 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-110010
PROVN OF BUILDING AND ALLIED SERVICES FOR E-MMS AT SUBROTO PARK, DELHI CANTT (BUILDING/STRUCTURE ON DESIGN AND BUILD MODE)
2026_MES_757525_1
CEWAC/PAL/T-25/2025-26
Open Tender
Civil Works
Lump-sum
540 days
GE (P) (AF) PALAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹3,000
GE (P) (AF) PALAM
₹5.8 L
Yes
6 Jul 2026
21 Apr 2026
6 Jul 2026
21 Apr 2026
2 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | - | - | - | - |
| - | Design and Build of tech building for E-MMS three storeyed (G+3) with permanent specifications, including RCC domestic water tank, fire fighting tank of 12600 litres in total at terrace and underground sump cum fire pump house of 50,000 litre capacity, ramp etc complete all as specified and shown on drawings. | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part III | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part IV | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “ROAD, PATH AND HARDSTANDING WORKS & CULVERT" as listed in Schedule ‘A’ Part V | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part VI | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part VII | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “AREA DRAINAGE WORKS ” as listed in Schedule ‘A’ Part VIII | - | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY WORKS” as listed in Schedule ‘A’ Part IX | - | Lump sum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_852787.xls
BOQ • 0.58 MB
Tender.pdf
Tender Documents • 16.09 MB
Binder1.pdf
Additional Documents • 7.41 MB
Corrigendum03.pdf
PDF • 20.47 MB
Coveringletter.pdf
PDF • 0.76 MB
T25Corrigendum.pdf
PDF • 0.31 MB
doc02859120260520123209.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .