This tender is for New Retail Outlets and MODN off retail outlets in Pune Retail RO. Job will be divided
20000300-HD-10157
20000300-HD-10157
Open Tender
Two Bid
Pune, Maharashtra
₹0
₹3 L
13 Aug 2020
24 Jul 2020
13 Aug 2020
13 Aug 2020
24 Jul 2020 - 5 Aug 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Site Survey upto 2000 SQM | Site Survey upto 2000 SQM — SITE SURVEY UPTO 2000SQM-JOB INCLUDES CARRYING OUT SURVEY AT SITE, SHOWN BY HPCL ENGINEER IN-CHARGE AND ESTABLISHING CORNERS AND BOUNDARIES AT SITE AND INSTALLING BRICK WORK BENCH MARK DULY PLASTERED AT ALL THE CORNERS FOR EASY IDENTIFICATION. VERIFYING THE BOUNDARY DETAILS GIVEN BY HPCL AND COMPUTATION OF ACTUAL SITE LAYOUT PLAN ARE TO BE DONE. MAKING TEMPORARY GRID MARKING OF THE AREA UNDER SCOPE OF SURVEY, AT EVERY 5 M INTERVAL IN BOTH THE PERPENDICULAR DIRECTIONS. RECORDING THE LEVELS WITH RESPECT TO THE PERMANENT B.M (TO BE ESTABLISHED BY SURVEY TEAM) USING DUMP LEVEL/THEODOLITE. | - | Lump Sum |
| 2 | Site Survey 2001 10000 SQM | Site Survey 2001 10000 SQM — SITE SURVEY 2001 TO 10000 SQM-JOB INCLUDES CARRYING OUT SURVEY AT SITE, SHOWN BY HPCL ENGINEER IN-CHARGE AND ESTABLISHING CORNERS AND BOUNDARIES AT SITE AND INSTALLING BRICK WORK BENCH MARK DULY PLASTERED AT ALL THE CORNERS FOR EASY IDENTIFICATION. VERIFYING THE BOUNDARY DETAILS GIVEN BY HPCL AND COMPUTATION OF ACTUAL SITE LAYOUT PLAN ARE TO BE DONE. MAKING TEMPORARY GRID MARKING OF THE AREA UNDER SCOPE OF SURVEY, AT EVERY 5 M INTERVAL IN BOTH THE PERPENDICULAR DIRECTIONS. RECORDING THE LEVELS WITH RESPECT TO THE PERMANENT B.M (TO BE ESTABLISHED BY SURVEY TEAM) USING DUMP LEVEL/THEODOLITE. | - | Lump Sum |
| 3 | ACRE BEYOND 10000 SQM | ACRE BEYOND 10000 SQM — SITE SURVEY BEYOND 10000 SQM-JOB INCLUDES CARRYING OUT SURVEY AT SITE, SHOWN BY HPCL ENGINEER IN-CHARGE AND ESTABLISHING CORNERS AND BOUNDARIES AT SITE AND INSTALLING BRICK WORK BENCH MARK DULY PLASTERED AT ALL THE CORNERS FOR EASY IDENTIFICATION. VERIFYING THE BOUNDARY DETAILS GIVEN BY HPCL AND COMPUTATION OF ACTUAL SITE LAYOUT PLAN ARE TO BE DONE. MAKING TEMPORARY GRID MARKING OF THE AREA UNDER SCOPE OF SURVEY, AT EVERY 5 M INTERVAL IN BOTH THE PERPENDICULAR DIRECTIONS. RECORDING THE LEVELS WITH RESPECT TO THE PERMANENT B.M (TO BE ESTABLISHED BY SURVEY TEAM) USING DUMP LEVEL/THEODOLITE. | - | Lump Sum |
| 4 | SITE CLEARANCE | SITE CLEARANCE — Surface dressing of the ground including removing small plants, bushes ,vegetation (dia less than 4") and making surface levelled and disposal of rubbish outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge. | - | Square Meters |
| 5 | EXCAVATION IN EARTH UPTO | EXCAVATION IN EARTH UPTO — Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | Cubic Meters |
| 6 | EXCAVATION - 1.5 TO 3 M | EXCAVATION - 1.5 TO 3 M — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH BETWEEN 1.5 TO 3 M | - | Cubic Meters |
| 7 | EXCAVATION - 3 TO 4.5 | EXCAVATION - 3 TO 4.5 — Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | Cubic Meters |
| 8 | EXCAVATION- HARD ROCK | EXCAVATION- HARD ROCK — Excavation for foundation upto required depth below existing ground level up to 1.5 m. depth in concrete road by chiselling / pneumatic drilling . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the job to restore the original state of the ground and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including curing, watering and compaction and complete . The measurement of the excavation would be based on actual depth of excavation. | - | Cubic Meters |
| 9 | -EXCAVA-HARDROCK 1.5 3.0 | -EXCAVA-HARDROCK 1.5 3.0 — Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK 1.5 mts- 3.0 mts | - | Cubic Meters |
| 10 | -EXCAVA-HARD ROCK 3.0 4.5 | -EXCAVA-HARD ROCK 3.0 4.5 — Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK BETWEEN 3 TO 4.5 | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000300-HD-10157.pdf
TENDER_DOCUMENT • 24.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .