Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.7 Laccepted-aoc | ₹7.7 L | accepted-aoc |
Tender Value
₹7.7 L
EMD Value
₹19,219
Closing Date
30 Jun 2026, 10:30 pmClosed
Karnataka Forest Department
ACF Prashanth Kumar Pai
Raising of Plantation ANR model-3 (No. of Pits-278 Slze - 0.75 M3 No. of PBS-278 - 10x16) Deraje-Gundla of Poomale RF of Sullia Range
KFD/2026-27/OW/WORK_INDENT35867/CALL-3
KFD/2026-27/OW/WORK_INDENT35867/CALL-3
Open
Other Works
Electronic Documents, First(One Cover)
KFD ACF Territorial Sub Division Office Subramanya-Sullia
₹500
₹19,219
30 Jun 2026
20 Jun 2026
29 Jun 2026
Raising of Plantation ANR model-3 (No. of Pits-278 Slze - 0.75 M3 No. of PBS-278 - 10x16) Deraje-Gundla of Poomale RF of Sullia Range
Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100% of the pit as the case may be with the excavated soil, duly breaking the clods & arranging the remaining soil ...
Loading of polythene bagged seedlings into the vehicle at the nursery site and unloading at the site nearest to the planting site including 10% casuality replacement.
(e) Seedlings raised in 10”x16...
Transportation of polythene bagged seedlings in hired truck from the nursery site to planting site.
(e) Seedlings raised in 10”x16” size bags.
(iii) Distance from 21 to 30 km. (Considering the act...
Conveyance of polythene bagged seedlings on head load from the dumping site to planting location near each trench/pit. (Distance upto 3 km).
(e) 10”x16” size bagged seedlings.
Watering polythene bagged seedlings at planting site by dipping in water, including carrying of water.
(d) 10”x16” size bagged seedlings
(This should be resorted to in dry conditions only).
Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in trench / pits including scooping the soil to required depth, pressing the soil gently around the seedlings after ...
Purchase of NPK / DAP (50 gms per plant)
Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses.
First weeding around the plants (pits) to a radius of 60 cm.
Scraping of grass and other weed growth around the plants to a radius of 60 cm (Scraping item is allowed only in grass infested areas.)
Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to radius of 60 cm. so as to loosen the soil around the plants.
Protection of plantation as per the standard norms from 01-07-2025 to 31-03-2026 for 274 days (for 25 ha. as a unit during the year and pro-rata for different extent for the actual period)
Fire Protection work in plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations.
Providing & fixing quality plantation board (48"x27"x18" including painting, writing, trasportation & fixing)
Maintenance of seedlings 10"x16” till planting during 2025 rains
Raising of seedlings 10"x16" for casualty replacement during 2025-26
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Spillover Work Revised.pdf
Tender Document • 4.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .