Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-Finance | ₹33.6 L | L1 | Accepted-Finance WO |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L2 |
Tender Value
₹35.6 L
EMD Value
₹35,606
Closing Date
28 Jun 2026, 5:00 pmClosed
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
Constn. of 1st floor Shopping complex infront central school in W.N-09
2026_ORULB_131363_132
BM_08_2026_27
Open Tender
Civil Works - Roads
Percentage
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹35,606
Yes
21 Sept 2026
10 Jun 2026
29 Jun 2026
10 Jun 2026
28 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. In 1st floor | 54.48 | Cum | 6,556.87 | ₹3,57,198.61 |
| 2 | Supplying , fitting , fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete in 1st floor | 59.92 | Qntl | 9,402.61 | ₹5,63,442 |
| 3 | Supplying all labour T&P material for Rigid & smooth Shuttering for Column/Beam in 1st floor | 250.31 | Sqm | 1,463.64 | ₹3,66,368.12 |
| 4 | Supplying all labour T&P material for Rigid & smooth Shuttering for Roof Slab incl all cost in 1st floor | 282.21 | Sqm | 923.03 | ₹2,60,491.07 |
| 5 | Supplying all labour T&P material for 1st ClassFly Ash Bricks in CM (1:6) in superstructure in 1st floor | 105.26 | Cum | 6,073.95 | ₹6,39,319.68 |
| 6 | 12mm thk Cement Plaster in CM (1:6) incl all cost in 1st floor | 920.16 | Sqm | 200.58 | ₹1,84,566.29 |
| 7 | 6mm thk Cement Plaster in CM(1:4) to RCC Surface incl all cost in 1st floor | 164.4 | Sqm | 221.94 | ₹36,485.83 |
| 8 | 2.5cm thk grading in CC (1:2:2) | 277.66 | Sqm | 405.69 | ₹1,12,645.1 |
| 9 | Painting two coat Emulsion paint over 1 coat Primer with any approved shade incl all cost in 1st floor | 1,084.56 | Sqm | 189.66 | ₹2,05,697.27 |
| 10 | Supplying and fixing of Rolling shutter | 5,135.9 | Kg | 115 | ₹5,90,628.5 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_596038.xls
BOQ • 0.24 MB
3rdcorrigendum.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .