Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1,688.58Admitted-Finance BELABAGAN B DEOGHAR 814142 JHARKHAND | DEOGHAR | DEOGHAR | JHARKHAND | 814142 | ₹1,688.58 | L1 | Admitted-Finance |
| 2 | L2₹7,562.62Admitted-Finance | ₹7,562.62 | L2 | Admitted-Finance |
| 3 | L3₹7,729Admitted-Finance | ₹7,729 | L3 | Admitted-Finance |
| 4 | L4₹8,313.10Admitted-Finance IN FRONT OF GAYATRI MANDIR MAHUA DANGAL DUMKA JHARKHAND | DUMKA | DUMKA | JHARKHAND | ₹8,313.10 | L4 | Admitted-Finance |
| 5 | L5₹8,585.29Admitted-Finance 6A GAU KRIPA MOHKAMPUR PHASE 1 INDUSTRIAL AREA DELHI ROAD MEERUT UTTAR PRADESH 250002 UDYAM UP 56 0005742 09AAGCA9887N1ZM R M MII STATUS AS VERIFIED | MEERUT | UTTAR PRADESH | 250002 | ₹8,585.29 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Priyam Enterprises L6 | Jay Prakash Singh L8 | SANJEEV ELETRIC WORKS L11 | M/S SATNAM ENTERPRISES L3 | DEEPAK ELECTRICALS L9 | S R Trading Company L10 | Singh Electrical Work L12 | M/S Shivam Traders L4 | RAJA ENTERPRISING COMPANY PRIVATE LIMITED L13 | M/s Nandani Steel Industries L1 | ANUSHREE ELECTRICAL ENGINEERS PRIVATE LIMITED L5 | MS AJAY BIJAY L2 | M/s Jai Mata Di Enterprises L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||||||||||||
| 1.01 | Sleeving Tube- 6 mm | 1 | Meter | 12 ₹14.16 | 16 ₹18.88 | 15 ₹17.70 | 10 ₹11.80 | 15 ₹17.70 | 17 ₹20.06 | 14 ₹16.52 | 14 ₹16.52 | 13 ₹28.34 | - | 17 ₹20.06 | 11 ₹12.98 | 16 ₹18.88 |
| 1.02 | Sleeving Tube- 4 mm | 1 | Meter | 10 ₹11.80 | 15 ₹17.70 | 14 ₹16.52 | 8 ₹9.44 | 12 ₹14.16 | 17 ₹20.06 | 18 ₹21.24 | 17 ₹20.06 | 15 ₹32.70 | - | 11 ₹12.98 | 9 ₹10.62 | 16 ₹18.88 |
| 1.03 | Sleeving Tube- 3 mm | 1 | Meter | 10 ₹11.80 | 16 ₹18.88 | 17 ₹20.06 | 7 ₹8.26 | 11 ₹12.98 | 16 ₹18.88 | 18 ₹21.24 | 11 ₹12.98 | 13 ₹28.34 | - | 14 ₹16.52 | 8 ₹9.44 | 15 ₹17.70 |
| 1.04 | Sleeving Tube- 2 mm | 1 | Meter | 8 ₹9.44 | 11 ₹12.98 | 15 ₹17.70 | 6 ₹7.08 | 14 ₹16.52 | 17 ₹20.06 | 13 ₹15.34 | 10 ₹11.80 | 15 ₹32.70 | - | 12 ₹14.16 | 7 ₹8.26 | 13 ₹15.34 |
| 1.05 | Backalite Tube- 3/8" x ½" | 1 | Meter | 23 ₹27.14 | 25 ₹29.50 | 29 ₹34.22 | 19 ₹22.42 | 27 ₹31.86 | 23 ₹27.14 | 27 ₹31.86 | 26 ₹30.68 | 24 ₹52.32 | - | 22 ₹25.96 | 20 ₹23.60 | 26 ₹30.68 |
| 1.06 | Backalite Tube- 3/4" x ⅝" | 1 | Meter | 20 ₹23.60 | 25 ₹29.50 | 23 ₹27.14 | 16 ₹18.88 | 22 ₹25.96 | 28 ₹33.04 | 29 ₹34.22 | 22 ₹25.96 | 23 ₹50.14 | - | 30 ₹35.40 | 17 ₹20.06 | 26 ₹30.68 |
| 1.07 | MS Nuts and Bolts ½" x 1 ½” (F.Th.) | 1 | Kg. | 140 ₹165.20 | 150 ₹177 | 155 ₹182.90 | 137 ₹161.66 | 143 ₹168.74 | 175 ₹206.50 | 163 ₹192.34 | 130 ₹153.40 | 145 ₹316.10 | 164 ₹193.52 | 129.75 ₹153.10 | 131 ₹154.58 | 163 ₹192.34 |
| 1.08 | MS Nuts and Bolts ⅜" x 1.5" (F.Th.) | 1 | Kg. | 148 ₹174.64 | 164 ₹193.52 | 163 ₹192.34 | 139 ₹164.02 | 159 ₹187.62 | 132 ₹155.76 | 167 ₹197.06 | 150 ₹177 | 132 ₹287.76 | 153 ₹180.54 | 155 ₹182.90 | 133 ₹156.94 | 160 ₹188.80 |
| 1.09 | MS Nuts and Bolts ⅝" x 1.5" (F.Th.) | 1 | Kg. | 164 ₹193.52 | 157 ₹185.26 | 159 ₹187.62 | 139 ₹164.02 | 163 ₹192.34 | 149 ₹175.82 | 134 ₹158.12 | 143 ₹168.74 | 155 ₹337.90 | 160 ₹188.80 | 153 ₹180.54 | 135 ₹159.30 | 163 ₹192.34 |
Tender Value
₹28.5 L
EMD Value
₹57,100
Closing Date
15 Jan 2026, 5:00 pmClosed
G.M.-Cum-Chief Engineer
G.M.-Cum-Chief Engineer, ESA, 33/11 KV PSS, Daridih, Giridih
302/PR/JBVNL/2025-26 Supply Of TRW Materials under OandM Head for F.Y. 2025-26 under ESA, Giridih
2025_JSEB_108314_1
302/PR/JBVNL/2025-26
Open Tender
Supply of Materials
33/11 KV PSS, Daridih
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Yes
₹57,100
Yes
ESA, Giridih
19 Mar 2026
29 Dec 2025
17 Jan 2026
29 Dec 2025
15 Jan 2026
29 Dec 2025
6 Jan 2026
Sleeving Tube- 6 mm
Sleeving Tube- 4 mm
Sleeving Tube- 3 mm
Sleeving Tube- 2 mm
Backalite Tube- 3/8" x ½"
Backalite Tube- 3/4" x ⅝"
MS Nuts and Bolts ½" x 1 ½” (F.Th.)
MS Nuts and Bolts ⅜" x 1.5" (F.Th.)
MS Nuts and Bolts ⅝" x 1.5" (F.Th.)
MS Nuts and Bolts ⅜" x 2" (F.Th.)
MS Nuts and Bolts ⅜" x 3 ½” (F.Th.)
MS Washer 1" dia
MS Washer ⅜
MS Washer ½"
MS Washer (Diff. Size)
MS Plug (Diff. Size)
CI Cap (Diff. Size)
HT Bushing Clamp (4/6 hole)
Al. Netural Clamp
Al. Clamping Member (Al. HT Member)
BTC Strip
Tinned Coper Strip
RC Washer 109 x 78 x 5 mm
RC Washer 70 x 45 x 5 mm
RC Washer 50 x 28 x 5 mm
RC Washer 32 x 14 x 5 mm
RC Washer 45 x 28 x 5 mm
RC Washer 89 x 58 x 5 mm
RC Sheet (3x2x6) mm (1/2 mm)
RC Strip 40x5 mm [100*63 KVA]
RC Strip 50x5 mm [200 KVA]
LT Boll Washer (Conical) 20 mm (200 KVA) [3/4"]
LT Boll Washer (Conical) 12 mm (100/63 KVA) [1/2"]
HT Boll Washer (Conical)
Nylon Washer for HT ½"
Nylon Washer for LT
Rubberised cork Sheet 3'x2'x6' mm
Rubberised cork Sheet 3'x2'x10' mm
Breather 200 KVA
Breather 100 KVA
Breather 63 + 25 KVA
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_146246.pdf
techsummary_146246.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
TenderDocument_302.pdf
Tender Documents • 1.10 MB
BOQ_146246.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid