Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance M S TECH NIG COMPUTERS NOOR ULLAH ROAD 48 64 NOORUAH ROAD ALAHABAD UTTAR PRADESH 211003 | PRAYAGRAJ | UTTAR PRADESH | 211003 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
8 Sept 2020, 6:40 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (West) Allahabad
GE (West) Allahabad, New Cantt-211001
Repair/Overhauling of 315 KVA (SM No 0722/3974/Tr/17) transformer at COD Chheoki Allahabad
2020_MES_372653_1
3009/17/E3
Limited
Job Works
Works
30 days
GE (West) Allahabad, New Cantt
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
9 Sept 2020
27 Aug 2020
9 Sept 2020
27 Aug 2020
8 Sept 2020
27 Aug 2020
27 Aug 2020 - 28 Aug 2020
90 days
Amount
Disconnecting/Removing of HT/LT cable and earth connections of copper wound, 11KV/433 Volts of capacity 315 KVA, Outdoor/ Indoor type transformer of any make, draining out of the transformer oil in empty barrels provdided by the department and transporting from site to a civil workshop approved by Engr-in-Charge (T&P and crane /vehicle to be arranged by the contractor), opening of the transformer in wksp, taking out core and coil assembly including HT/LT coil assy, removing tape, paper insulation strips etc gentaly & carefully all specified and directed.
Overhauling of distribution transformer of capacity up to 315 KVA after opening all nuts, bolts and breather and breathing agent, along with cooling fins, oil temp indicator taking out wheels, cleaning the surface using approprite cleaning agnt making goods the rough surface of transformer after removing it with the help of mettalic paper, including painting with synthetic enemelled spray paint siemens gray including replacement of gasket forcable of boxes, replacement of nuts bolts copper washer, cleaning of HV, LV and bushing with CRS solution replacement breathing agent and reassembling of all the deposit dert, repair/maintenace of damage fins by brazing etc, completeall as specified and directed by Engr-in-Charge. Note:- (i) Transformer shall be required from auth electric wksp of UPPCL/Company. The wksp owner shall have electrical liecence issued from state/central govt. (ii) One year gurantee for smooth functioning of transformer for any defect shall be submitted by the vender.
M&L Labour of the followings:-
Supply and fixing (in replacement) LV leg coils/HV leg coils copper conductor of existing guage, insulation & No of turns for distribution transformer up to 400 KVA capacity complete with insulation, varnishing by vaccum impregnation and baking of coil assembly in oven, including disconection of tap changer, opening of core, as required and refixing after coil replacement complete all as specified & directed by the EIC.
Reinsulation of HV leg coil of copper conductor with insulation, warnishing by vaccum impregnation and baking of coil assembly etc complete.
Reinsulation of LV leg coil of copper conductor with insulation, warnishing by vaccum impregnation and baking of coil assembly etc complete.
HV porcelain bushing complete.
LV porcelain bushing complete.
HV bushing (Metal Part).
LV bushing (Metal Part).
Gasket set complete.
Silica gel breather assembly with fresh silica gel.
Tapping switch with handle complete
Old transformer oil with filteration machine complete.
Fresh transformer oil filteration machine complete, Make: Savita or as approved.
Sundry items viz. cover bolts, plug caps, nuts scews etc.
Dial type thermometer/ tempreture guage complete with resetting device.
M&L painting of transformer outside portion only with one coat with spray painting with syenthetic enemel paint after preparetion of surface neat and clean for painting complete all as specified and directed.
Installtion including necessary electric connection, testing, commissioning of transformer and carrying out all routine tests complete all as specified and directed.
SCHEDULE OF CREDIT Rate quoted by the Tenderer for this schedule should not be less than rate assessed by the department shown on estimated rate column for the respective items.
HV/LV Porclain Bushing complete
HV/LV bushing (Metal Part)
Gasket set complete.
Silica Gel Breather with fresh silica gell
Tapping switch with handle complete
Sundry items viz cover bolts, plug caps, nuts screws etc.
Dial type thermometer/ tempreture guage complete with resetting device.
Old UNSV LV Leg Coils/HV Leg Coils Copper.
DINESH ELECTRICALS
CROWN ENGINEERING CORPORATION
SHUBHAM CONTRACTOR
stage.html
html • 0.02 MB
finance_415744.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .