| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC Below Rate | |
| 2 | L2₹6.9 L+₹10,107.10 (1.48%)Rejected-Finance | L2 | Rejected-Finance above |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
30 Jan 2024, 3:00 pmClosed
Executive Officer
50 erode karur main road, salaipudhur
Construction of Strom water Drain and With RCC Slab Culvert 1 no at ward no10 EB office Street and ward no5 panchayat office North street Chennasamudram Townpanchayat
2024_DTP_410541_1
255/2023
Open Tender
Civil Works
Works
180 days
Chennasamudhram Town Panchayat
Tender Documents
2 documents required · 2 mandatory
₹0
₹8,200
5 Feb 2024
18 Jan 2024
30 Jan 2024
18 Jan 2024
30 Jan 2024
18 Jan 2024
18 Jan 2024 - 30 Jan 2024
Amount
Earth work excavation and depositting on bank with initial lead and lift as per SS 20 B etc., complete as per standard specification.
collection and supply of stone dust, including cost and convenience of materials and labour charges for stone dust filling etc., complete as per standard specification
Providing Plain Cement concrete of mix 1:4:8 using 40mm ISS gauge size hard broken including cost conveyance of all materisl to site including labour charges etc.,complete as per standard specification
centring and shuttering of all items of PCC works including labour charges extra complete as per standard specificatio
centring and shuttering of all items of RCC works including labour charges extra complete as per standard specification
PCC 1:2:4 mix using 20 mm iss hdg matter including cost and convenience of all materials and labour charge extra as per standard specification
Supply and Fabrication of steel including cost and conveance of Steel Rods and Binding Wire and including all labour charges for Cutting Placing, Jointing etc., as per standard specification.
Reinfoced Cement Concrete 1:1.5:3 (One Cement, One And Half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10 to 12 mm ISS metal to 25 mm thick including cost and convenience of all materials to site and all labour charges for mixing ,laying, curing extra complete
D . CHELLAMUTHU
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .