| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L | L1 | Accepted-AOC LESS |
| 2 | L2₹5.9 L+₹134.86 (0.02%)Rejected-AOC | ₹5.9 L+₹134.86 (0.02%) | L2 | Rejected-AOC ABOVE |
| Sl No | Description | Qty | Unit | ADHAV BUILDERSS L2 | T T CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling RCC as per the instruction of Departmental officers. | 14 | m3 | 5,071.34 ₹71,011.44 | 5,071 ₹71,006.68 Lowest |
| 2.00 | Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 1,141.99 | m3 | 106 ₹1,21,051.47 Lowest | 106 ₹1,21,051.47 Lowest |
| 3.00 | Supplying and fabricating and placing in postion MS or RTS Bar reinforcement to all RCC Works as per the
design given including cost of steel and bending wire also all floors. | 10 | Qtl | 9,542 ₹95,420 Lowest | 9,542 ₹95,420 Lowest |
| 4.00 | Supply of RCC precast slab 150mm thick in C.C. 1:1.5:3mix using 20m baby jelly including water curing, moulding charges etc., complete. Size of slab andvolume of concrete | 94 | m2 | 1,528.95 ₹1,43,721.3 | 1,528 ₹1,43,632 Lowest |
| 5.00 | RemovalofExcavatedExcessEarthawayfromthesiteto5K.Mincluding loading and transportation charges etc, complete as per standard specification. For 1M3 | 1,156 | m3 | 104 ₹1,20,223.74 Lowest | 104 ₹1,20,223.74 Lowest |
| 6.00 | Removing the Rcc Precast slab and labour for Conveying the Excvated Silt Including all initial lead and other labour charges. | 51 | Day | 690.8 ₹35,230.8 | 690 ₹35,190 Lowest |
| 7.00Add :- GST @ 18% | |||||
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
19 Dec 2025, 3:00 pmClosed
Assistant Commissioner
Coimbatore Corporation, Central zone, Hosur road, Coimbatore.641018
Desilting the Existing Channel and provding precast Slab at Masal Layout Channel in ward no 64 at Central Zone
2025_MAWS_631177_25
E6/2025-26/CZ
Open Tender
Civil Works
Works
Central zone
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹7,000
Yes
11 Aug 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
Dismantling RCC as per the instruction of Departmental officers.
Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges.
Supplying and fabricating and placing in postion MS or RTS Bar reinforcement to all RCC Works as per the design given including cost of steel and bending wire also all floors.
Supply of RCC precast slab 150mm thick in C.C. 1:1.5:3mix using 20m baby jelly including water curing, moulding charges etc., complete. Size of slab andvolume of concrete
RemovalofExcavatedExcessEarthawayfromthesiteto5K.Mincluding loading and transportation charges etc, complete as per standard specification. For 1M3
Removing the Rcc Precast slab and labour for Conveying the Excvated Silt Including all initial lead and other labour charges.
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_755196.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .