Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹1.5 LAccepted-Finance | ₹1.5 L | L2 | Accepted-Finance 2nd Lowest |
| 3 | L3₹1.5 LAccepted-Finance LOWER KAFFER KALIMPONG | KALIMPONG | ₹1.5 L | L3 | Accepted-Finance Highest |
Tender Value
₹1.5 L
EMD Value
₹2,913
Closing Date
6 Mar 2026, 12:00 pmClosed
Executive Officer,Pedong Panchayat Samity
Pedong Bazar,PO PS-Pedong,Dist-Kalimpong
Construction of Drain from Middle Jhushing towards Community Hall within Lingsey GP under Pedong Panchayat Samity
2026_GTA_1015591_7
10(10)/PDG/EO/15th CFC/25-26
Open Tender
CIVIL WORKS
45 days
Lingsey GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹2,913
26 May 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
PWD SOR(Roads) Page-284,It No-12.01,iv Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches,leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. a) upto 3 m depth. (iv) Without pumping out water and shoring
PWD SOR(Buildings) Page-229,It No-11 (A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth.
PWD SOR(Buildings) Page-302,It No-18 (B) Cost of Boulders Vide Quantity Item Number 2 (A)
PWD SOR(Buildings) Page No. 34, Item No. 22 (B),a (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (B) With N.B. Variety stone metal. (a) 1:3:6 proportion
PWD SOR(Roads) Page-332,It No-18.05(b) Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
PWD SOR(Buildings) Page No. 27 Item No. 1 1 Plum Concrete work with 40% cememt Concrete with 30mm down graded stone metal and 60 % of stone boulder of size 150 mm and above,placed in position as directed excluding shuttering if any
PWD SOR(Buildings) Page No. 189 Item No. 1 (ii)(a) Plaster to (wall floor ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course scaffolding /staging, where necessary (Ground floor). Excluding cost of chipping over concrete surface. (ii) With 1:6 Cement Mortar (a) 20 mm thick plaster
PWD SOR(Buildings) Page No. 166 Item No. 8 Neat cement punning about 1.50mm thick in wall ,dado,window sill,floor etc. Same as item No.7
Supplying fitting fixing Name Plate of white marbel stone of size 300mmx450mm including photograph of the work(pre,during and post)execution each 2 copies,etc all complete as per the direction of Engineer in Charge.
Add 18% GST
Add 1% Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2494949.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid