Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.4 LAdmitted-Fee/PreQual/Technical/Finance | -43.00% | ₹21.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹22.5 LAdmitted-Fee/PreQual/Technical/Finance NEAR NEW BUS STOP CHANDANI NAGAR GHUGUS TAH DIST CHANDRAPUR GHUGUS 442505 | GHUGUS | CHANDRAPUR | MAHARASHTRA | 442505 | -39.99% | ₹22.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹24.8 LAdmitted-Fee/PreQual/Technical/Finance NEAR RADHAKRISHNA MANDIR SHASTRINAGAR GHUGUS TAH DIST CHANDRAPUR 442505 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442505 | -34.00% | ₹24.8 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹25.5 LAdmitted-Fee/PreQual/Technical/Finance | -32.09% | ₹25.5 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹26.0 LAdmitted-Fee/PreQual/Technical/Finance | -30.80% | ₹26.0 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44.3 L
EMD Value
₹55,500
Closing Date
20 Jul 2026, 5:00 pmClosed
Jamandlamudi Sachin
AGM office Wani Area
Providing WBM Hard Stand for parking of road sale Trucks near check post No. 2 of Mungoli OCM under Mungoli Sub Area.
2026_WCL_361705_1
WCL wa4350-civ-e018-2026-27/346
Open Tender
Civil Works - Roads
Percentage
60 days
Mungoli
Please refer Tender documents.
3 documents required · 3 mandatory
₹55,500
21 Jul 2026
8 Jul 2026
21 Jul 2026
8 Jul 2026
20 Jul 2026
9 Jul 2026
8 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 675 | Cum | 200.85 | ₹1,35,573.75 |
| 2 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For Grading-II Material | 486 | Cum | 2,291 | ₹11,13,426 |
| 3 | Water Bound Macadam
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification. By Mechanical Means
(i) Grading- I (63 to 45mm) (a) Using Screening Type-A (13.2mmAgg.) | 729 | Cum | 2,229 | ₹16,24,941 |
| 4 | Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification.
By Mechanical Means
(ii) Grading- II (53 to 22.4mm
(a) Using Screening Type-B (11.2mm Agg.) | 364.5 | Cum | 2,348 | ₹8,55,846 |
| 5 | Compaction of ground by watering & rolling with vibratroy roller 8 tonne, as per instrutions of the Engineer-in-charge or representative(s), including cost of equipment,fuel, oil, operator,water etc all complete. The work is to be done 8 hours per day in general shift. only running time shall be measured for payment. In measurement, number of days shall be calculated as total number of running hours (as per actual neasurment) divided by 8. | 4 | Day | 6,915.76 | ₹27,663.04 |
| 6 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
finance_374591.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.93 MB
BOQ_374591.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].