| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC | ₹1.3 Cr | 1 | Accepted-AOC L1 Accepted |
| 2 | 2₹1.3 Cr+₹40,396.93 (0.32%)Rejected-Finance | ₹1.3 Cr+₹40,396.93 (0.32%) | 2 | Rejected-Finance L2 Rejected |
| 3 | 3₹1.3 Cr+₹2.4 L (1.92%)Rejected-Finance | ₹1.3 Cr+₹2.4 L (1.92%) | 3 | Rejected-Finance L3 Rejected |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Non response |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Non response |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
12 Mar 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA., PUDUKKOTTAI
Package No. 10 (Re-Tender)- Karambakkudi Panchayat Union - Strengthening and Five Year Maintanance of the Road from Orathanadu road to Manamadai Anganviduthi road km 0/0 - 2/0 in Odappaviduthi Panchayat Under NABARD RIDF XXX-2024-25
2025_RDTN_529255_1
PDK/DRDA/NABARD/RETEN/KKD-10
Open Tender
Civil Works - Roads
Item Rate
180 days
KARAMBAKUDI
Pl refer tender document
4 documents required · 4 mandatory
₹0
₹1.3 L
DRDA., PUDUKKOTTAI
1 Jun 2025
3 Mar 2025
12 Mar 2025
3 Mar 2025
12 Mar 2025
3 Mar 2025
7 Mar 2025
Amount
Strengthening and Five Year Maintanance of the Road from Orathanadu road to Manamadai Anganviduthi road km 0/0 - 2/0 in Odappaviduthi Panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Provision for KM and HM stones
Kilo metre stone
Hecta metre stone
Provision for Name Board Cum Citizen Board
Provision for 60 cm Equilateral triangle for Cautionary Sign Boards
Road Marking with Hot applied Thermoplastic compound with Reflectorising glass beads on Bituminous surface
Provision for Construction of 1.50m slab culvert@ Ch -400 m
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc. A
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Construction of 1.50m slab culvert@ Ch -550 m
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc. A
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Construction of 1.50m slab culvert@ Ch -810 m
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc. A
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Construction of 1.50m slab culvert@ Ch -1430 m
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc. A
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Provision for Construction of 1.50m slab culvert@ Ch -1990 m
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc. A
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
UDHAYA CONSTRUCTION (BID ID -1269229)
M.Ramamoorthy (BID ID -1269095)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .