| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
13 Jun 2022, 2:00 pmClosed
Superintending Engineer Namakkal
OFFICE OF SE/NEDC,SUBHA TOWERS, FIRST FLOOR,OPP TO JAISURYA COMPLEX,TIRUCHENGODE ROAD NAMAKKAL
WORKS CONTRACT FOR KALAPPANAIKENPATTY SUBDIVISION FOR EXECUTION OF RDSS SCHEME SANCTIONED WORKS FOR IN SUBDIVISION LEVEL
2022_EB_235173_1
Spec.No.025/22-23dt.06.06.22
Open Tender
Electrical Works
Works
365 days
KALAPPANAIKENPATTY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
16 Jun 2022
6 Jun 2022
14 Jun 2022
6 Jun 2022
13 Jun 2022
6 Jun 2022
EXCAVATION OF POLE PITS / Stay Set:
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Hard rock requires blasting
Hard rock without blasting (where houses are located)
Medium rock and dense Medium rock requires blasting
ERECTION OF POLES AND ACCESSORIES
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB ormaual
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or maual
Erection of stay set complete
Fixing of Line Materials
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Double Channel X-arm
Guarding Cross arm
Tapping Channel Cross arm
LT 3 phase cross arms
LT Single phase cross arms
HT/LT TI Fittings
Fixing of Aluminium Knob
Fixing of HT pin Insulators 11 KV
Fixing of HT pin Insulators 22 KV
Fixing of HT 11 KV strain disc.
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Fixing of HT LAS (3 nos)
Fixing of LT LAS (3nos)
Re-sagging of HT/LT lines
Re-sagging of ACSR 7/4.72 mm Dog conductor
Re-sagging ACSR 7/4.09 mm Raccoon conductor
Re-sagging ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
Releasing of ACSR/AAAC conductors from conductor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 MM
SERVICE ERECTED:
Erection of street light including fixure fitting
Erection of street light service
Fixing of new SV/MV lamp fittings
Fixing of new CFL/ LED lamp fittings
Hut service fixing
Agricultural service fixing
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Releasing of 3 phase service and (above 50 HP) re-fixing.
Tieing of service connection with erection of clamp jumper in Low tension SC/line,Aerial Board, Fuse unit and looping.
Tieing of service connection with erection of clamp jumper in Low tension SC/line,Aerial Board, Fuse unit and looping.
CONCRETING WORKS:
Mass concreting including materials (Cement + River sand/ Msand and Blue metals and watering)
Sleeve concreting including materials (Cement + River Sand/ Msand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Base Concreting including cost of materials and labour 2'x2'x1' (If base plate not provided)
EARTHING:
Earthing of pole with coil earthing including burying looping and binding.
Replacement of earthing of pole with coil earthing including burying looping and binding
LOADING AND UNLOADING CHARGES:
Loading of poles upto 8.0 M/ 27'
Loading of poles above 8.0 M
Loading of metal poles (All sizes)
UnLoading of poles upto 8.0 M/ 27'
UnLoading of poles above 8.0 M
Loading of metal poles (All sizes)
Loading of cement bag of 50Kg.
Unloading of cement bag of 50Kg.
Loading of materials
Unloading of materials
Leading and stacking of materials
Loading or unloading of Transformer upto 100 KVA
Loading or unloading of Transformer above 100 and upto 200 KVA
Loading or unloading of Transformer above 200 KVA
Erection of New Transformer all capacities (with jumpering)
Guarding Arrangement
Flat guarding including fixing of 2 Nos. cross arms.
HT Guarding
Railway Crossing ( Cradle guarding).
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms (Plains)
Below 8 Kms (Hills)
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Dismantling Charges
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Dismantling of stay set complete
Dismantling of 1ph xarm
Dismantling of 3ph xarm
Dismantling of HT/LT TI fitting
Dismantling of 22kV Pin insulator
Dismantling of 22 kV strain disc
Dismantling of LT Pin insulator
Dismantling of LT shackle
Dismantling of Aluminium knob
Dismantling of conductor of size ACSR 7/2.59 /AAAC 7/2.50
Dismantling of conductor of size ACSR 7/3.35 /AAAC 7/3.15
Dismantling of conductor of size ACSR 7/4.09
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
PAINTING:
Painting of metal poles including cross arms (excluding cost of paint)
Numbering of pole with paint and with base painting.
Painting of RCC/PSC poles (Colour washing)
Painting of Transformer (Double coat)
Painting of HT metering set and Box
Painting of service connection details in meter board /Agricultural services /Hut services door including cost of paint and brush.
Lathe Works
Manufacturing of special type clamps for Rail pole, RSJ pole, Tubular pole, Special clamps for distribution transformer structure using 50x8 MS flat/ 65x10 MS flat
Labour charges for alteration of Back Clamps/ Stay Clamps to suit for the works
Drilling of hole in channel only 3/4" & 1"
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
Cutting of RSJ pole
RSJ pole welding
T.I.Fitting welding with clamps
GENERAL:
Set right the leaning of poles (All size of poles)
Engaging of JCB/ Crane for first 2 Hrs
Engaging of JCB/ Crane For every additional Hrs
DT/ DP erection
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle excluding concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure excluding concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreting
Paving of HT/LT lines
ACSR 7/4.72 mm Dog conductor
ACSR 7/4.09 mm Raccoon conductor
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
MISCELLANEOUS WORKS
Releasing of Grills from RCC Poles
Releasing of HTs wire from PSC pole
Cutting of coconut leaves
Clearing of branches of trees
Clearing of jungle
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .