Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC Ist Lowest | |
| 2 | L2₹4.6 L+₹7,114 (1.58%)Rejected-AOC AASHIYANA SECTOR N 304 KILA CHAURAHA KANPUR ROAD AASHIYANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L2 | Rejected-AOC IInd Lowest | |
| 3 | L3₹5.4 L+₹90,250 (20.1%)Rejected-AOC | L3 | Rejected-AOC IIIrd Lowest |
Tender Value
₹6.0 L
EMD Value
₹6,100
Closing Date
4 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
102/ETC-II(P)/ 2023-2024
2024_UPTCL_900261_1
102/ETC-II(P)/ 2023-2024
Open Tender
Electrical Works
Item Rate
60 days
132 KV S/S NAINI COMPLEX
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹6,100
8 Jul 2024
20 Feb 2024
5 Mar 2024
20 Feb 2024
4 Mar 2024
20 Feb 2024
Amount
Shifting/Dragging of oil filled 40 MVA Transformer from existing place to near loading place at 132 KV S/S Jigna (Mirzapur) Distance up to 20 meter.
Additional shifting 20 mtrs @5 mtrs per job.
Loading of 40 MVA T/F main tank along with accessories, making the wooden sleeper plateform for jacking the T/F tank up to trailer height placing the rail under T/F tank and shifting on trailer, remove the rail from under Transformer tank, proper tightening of main tank with trailer bed with the help of steel rope and turn buckle.
Packing of HV/LV/N Bushing of Transformer in wooden box.
Safe carriage of 40 MVA T/F tank from 132 KV S/S Jigna (Mirzapur) to 132 KV S/S Naini Complex (Prayagraj) by hydraulic Multi Excel Trailer along with all accessories (Approx dist. 60 km)
Unloading of main tank of 40 MVA T/F loaded on Trailer jacking the tank for placing the rail under the T/F tank and shifting it on wooden to plateform. Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various T/F accessories of above 40 MVA T/F like oil filled drums, bushing, conservator tank, cooling fan etc. from track/trailer at site at 132 KV S/S Naini Complex, Prayagraj.
Overhauling of OLTC complete with replacement of gasket after removing of oil from its chamber filling the fresh transformer oil and all other associated works for complete the job satisfactorily.
Spray painting of 40 MVA Power T/F with one coat of red oxide primer & two coats of standard make light gray 608-1 synthetic enamel paint of first quality after cleaning of rust, dust & oily surface including cost of all material labour & T&P as per Technical specification.
SMV POWER SOLUTION
HARE KRISHNA ENERGY PROJECTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .