| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹7,700
Closing Date
9 Feb 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER (VP) MELUR
PANCHAYAT UNION OFFICE MELUR
MADURAI DISTRICT MELUR BLOCK RENOVATION OF LIBRARY BUILDING UNDER AGAMT PH II PACKAGE NO 01
2022_RDTN_222264_1
2674/2021/T2/mel01
Open Tender
Civil Works
Item Rate
60 days
Melur
Refer Tender document
3 documents required · 3 mandatory
₹0
₹7,700
9 Feb 2022
3 Feb 2022
9 Feb 2022
4 Feb 2022
9 Feb 2022
4 Feb 2022
90 days
Amount
RRPointing with cement Mortar 1:3 mix for Random Rubble masonry etc
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete..
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering with colour pigments in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete complying wi
Plastic emulsion two coats with emulsion including cost and conveyance of all materials, labour charges etc.,copmlete
Painting two coat of old iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Tube Light
AC Ceiling Fan
Provisiion for Rain water haversting sturucture
Provision for Ramp and hand rails
Provision for Name board
Toilet
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication
Supplying, fabricating and placing in position inild steel or ribbed tor steel shall be supplied by the Contractor.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Fabrication and Supply of MILD STEEL DOOR 0.75x2.10m
RRPointing with cement Mortar 1:3 mix for Random Rubble masonry etc
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete..
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering with colour pigments in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete complying wi
Plastic emulsion two coats with emulsion including cost and conveyance of all materials, labour charges etc.,copmlete
Painting two coat of old iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Tube Light
AC Ceiling Fan
Provisiion for Rain water haversting sturucture
Provision for Ramp and hand rails
Provision for Name board
Toilet
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication
Supplying, fabricating and placing in position inild steel or ribbed tor steel shall be supplied by the Contractor.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Fabrication and Supply of MILD STEEL DOOR 0.75x2.10m
RRPointing with cement Mortar 1:3 mix for Random Rubble masonry etc
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete..
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering with colour pigments in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete complying wi
Plastic emulsion two coats with emulsion including cost and conveyance of all materials, labour charges etc.,copmlete
Painting two coat of old iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Tube Light
AC Ceiling Fan
Provisiion for Rain water haversting sturucture
Provision for Ramp and hand rails
Provision for Name board
Toilet
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication
Supplying, fabricating and placing in position inild steel or ribbed tor steel shall be supplied by the Contractor.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Leach pit arrangement
Fabrication and Supply of MILD STEEL DOOR 0.75x2.10m
RRPointing with cement Mortar 1:3 mix for Random Rubble masonry etc
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete..
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering with colour pigments in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete complying wi
Plastic emulsion two coats with emulsion including cost and conveyance of all materials, labour charges etc.,copmlete
Painting two coat of old iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Tube Light
AC Ceiling Fan
Provisiion for Rain water haversting sturucture
Provision for Ramp and hand rails
Provision for Name board
Toilet
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication
Supplying, fabricating and placing in position inild steel or ribbed tor steel shall be supplied by the Contractor.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Fabrication and Supply of MILD STEEL DOOR 0.75x2.10m
RRPointing with cement Mortar 1:3 mix for Random Rubble masonry etc
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly inculding curing ete.complete..
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Paving the floor with Stain free nano polish vitrified tiles of approved quality and colour of size 600 mm x 600 mm x 8 mm of approved make, quality and colour in all floors over a base layer of CM 1:3, 20mm Tk
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering with colour pigments in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete complying wi
Plastic emulsion two coats with emulsion including cost and conveyance of all materials, labour charges etc.,copmlete
Painting two coat of old iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Tube Light
AC Ceiling Fan
Provisiion for Rain water haversting sturucture
Provision for Ramp and hand rails
Provision for Name board
Toilet
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication
Supplying, fabricating and placing in position inild steel or ribbed tor steel shall be supplied by the Contractor.
Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification.
Finishing the exposed surface of RCC items of work with Cement Mortar 1:3 (one cement and three sand) 10mm. Thick in all floors including racking the surface and all labour charges etc., complete complying with standard specification.
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Painting two coats with Oil bound Distemper over old white wash surface , ceiling by through Scrapping of old plastered surface over priming coat etc
Towards the cost and supply of IWC with foot rest and P-trap, EWC with 10lts tank including all charges etc., complete
Leach pit arrangement
Fabrication and Supply of MILD STEEL DOOR 0.75x2.10m
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M ABDUL MUTHLIF
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .