Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.2 Cr+₹16.5 L (16.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.4 Cr+₹37.5 L (37.7%)Admitted-Finance NIZAM HOUSE RAJ STREET CHANDAUSI CHANDAUSI UTTAR PRADESH 244412 | SAMBHAL | UTTAR PRADESH | 244412 | L3 | Admitted-Finance | |
| 4 | L4₹1.4 Cr+₹39.6 L (39.8%)Admitted-Finance N A | NA | NA | 121004 | L4 | Admitted-Finance | |
| 5 | L5₹1.4 Cr+₹39.7 L (39.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHAHRUKH KHAN ENGINEERS AND SUPPLIERS L3 | SHRI FAHEEMUDDIN L4 | M/S SATYA SUROUP SINGH CONTRACTOR L1 | M/S IT CONSTRUCTION & GOVT SUPPLIER L5 | Prashant Dubey Contractor L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In- charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only.(251) SOR Aligarh 20-05-2022 | 2,188.5 | cum | 230 ₹5,03,355 | 255 ₹5,58,067.5 | 120 ₹2,62,620 Lowest | 250 ₹5,47,125 | 155 ₹3,39,217.5 |
| 2.00 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Fine sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.In Foundation and floors.Same as above 1:4:8 but in Coarse Sand (275a) SOR Aligarh 20-05-2022 | 185.4 | cum | 7,050 ₹13,07,070 | 7,200 ₹13,34,880 | 4,900 ₹9,08,460 Lowest | 7,150 ₹13,25,610 | 5,800 ₹10,75,320 |
| 3.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-150 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)(6.1.1) SOR Aligarh 20-05-2022 | 1,180.33 | cum | 7,200 ₹84,98,376 | 7,000 ₹82,62,310 | 4,900 ₹57,83,617 Lowest | 7,230 ₹85,33,785.9 | 5,900 ₹69,63,947 |
| 4.00 | Providing and laying cement concrete in 1:2:4
(1 Cement : 2 Coarse sand : 4 graded stone aggregate 20 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.(279) SOR Aligarh 20.05.2022
All work upto plinth level | 85.7 | cum | 7,500 ₹6,42,750 | 7,300 ₹6,25,610 | 5,800 ₹4,97,060 Lowest | 7,600 ₹6,51,320 | 5,900 ₹5,05,630 |
| 5.00 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.(b) 40mm thick floor with 20 mm nominal size stone aggregate.(11.3.1) SOR Aligarh 20-05-2022 | 1,257.79 | sqm | 380 ₹4,77,960.2 | 300 ₹3,77,337 Lowest | 350 ₹4,40,226.5 | 390 ₹4,90,538.1 | 400 ₹5,03,116 |
| 6.00 | 12 mm Cement plaster 1:3 of mix (1 cement: 3 coarse sand) finished with a floating coat of neat cement.(13.9.1) SOR Aligarh 20-05-2022 | 2,095.3 | sqm | 240 ₹5,02,872 | 240 ₹5,02,872 | 200 ₹4,19,060 Lowest | 210 ₹4,40,013 | 250 ₹5,23,825 |
| 7.00 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In- Charge within a distance of 60 meters (200 feet).(694) SOR Aligarh 20-05-2022 | 32.7 | cum | 200 ₹6,540 | 210 ₹6,867 | 950 ₹31,065 | 180 ₹5,886 Lowest | 1,200 ₹39,240 |
| 8.00 | Desilting of drain in foul condition or Earth work in Excavation in local soil & Mud including lift above 1.5 M with additinal lift of 1.5M or part of 1.5M and including disposal of rubbish outside of industrial area as directed by the Engineer incharge upto a distance after 3km from the excavation spot. | 2,819.24 | cum | 215 ₹6,06,136.6 Lowest | 250 ₹7,04,810 | 250 ₹7,04,810 | 225 ₹6,34,329 | 250 ₹7,04,810 |
| 9.00 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)(5.1.2) SOR Aligarh 20-05-2022 | 9.72 | cum | 8,400 ₹81,648 | 8,400 ₹81,648 | 7,200 ₹69,984 Lowest | 8,450 ₹82,134 | 7,500 ₹72,900 |
| 10.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)(i) upto plinth level(5.2.2) SOR Aligarh 20-05-2022 | 20.99 | cum | 8,500 ₹1,78,415 | 8,600 ₹1,80,514 | 7,500 ₹1,57,425 Lowest | 8,600 ₹1,80,514 | 9,000 ₹1,88,910 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
19 Apr 2023, 5:00 pmClosed
PGM (E)
A-1/4 Upsida Complex, Lakhanpur, Kanpur
Construction/Maintenance of Drain/Culvert, Desilting of Drain at I.A CDF Complex and Maintenance of Drain/Culvert in Sector-I,II and Housing Sector Distt Aligarh
2023_SIDC_790786_1
cd_4_320_dt_14032023
Open Tender
Civil Works
Item Rate
90 days
Aligarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,594
UPSIDA
₹2.8 L
19 May 2023
28 Mar 2023
20 Apr 2023
28 Mar 2023
19 Apr 2023
28 Mar 2023
Amount
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In- charge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only.(251) SOR Aligarh 20-05-2022
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Fine sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.In Foundation and floors.Same as above 1:4:8 but in Coarse Sand (275a) SOR Aligarh 20-05-2022
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation-150 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)(6.1.1) SOR Aligarh 20-05-2022
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 Coarse sand : 4 graded stone aggregate 20 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work.(279) SOR Aligarh 20.05.2022 All work upto plinth level
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.(b) 40mm thick floor with 20 mm nominal size stone aggregate.(11.3.1) SOR Aligarh 20-05-2022
12 mm Cement plaster 1:3 of mix (1 cement: 3 coarse sand) finished with a floating coat of neat cement.(13.9.1) SOR Aligarh 20-05-2022
Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In- Charge within a distance of 60 meters (200 feet).(694) SOR Aligarh 20-05-2022
Desilting of drain in foul condition or Earth work in Excavation in local soil & Mud including lift above 1.5 M with additinal lift of 1.5M or part of 1.5M and including disposal of rubbish outside of industrial area as directed by the Engineer incharge upto a distance after 3km from the excavation spot.
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :(a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)(5.1.2) SOR Aligarh 20-05-2022
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)(i) upto plinth level(5.2.2) SOR Aligarh 20-05-2022
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, including the cost of centering, shuttering, finishing and excluding reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).(5.3) SOR Aligarh 20-05-2022
Steel reinforcement for R.C.C. Work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.All Dia bars AOR Atteched
Prashant Dubey Contractor
SHAHRUKH KHAN ENGINEERS AND SUPPLIERS
SHRI FAHEEMUDDIN
M/S IT CONSTRUCTION & GOVT SUPPLIER
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
etenderdocument.pdf
Tender Documents • 1.18 MB
feeformatn.xls
Tender Documents • 0.02 MB
capabilitystatement.pdf
Tender Documents • 0.43 MB
BOQ_1317550.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .