Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 LAccepted-AOC 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹61.2 L+₹10.2 L (20.1%)Rejected-AOC | L2 | Rejected-AOC SECOND LOWEST BIDDER | |
| 3 | L3₹62.9 L+₹11.9 L (23.3%)Rejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | L3 | Rejected-Finance Third lowest bidder | |
| 4 | L4₹68.0 L+₹17.0 L (33.3%)Rejected-Finance PLOT NO 37 BADANPUR OLD SER NO 34658 NEAR SAI BARAT PALACE PAWAN BHUMI SHAKTI NAGAR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L4 | Rejected-Finance fourth lowest bidder | |
| 5 | L5₹68.3 L+₹17.2 L (33.8%)Rejected-Finance | L5 | Rejected-Finance fifth lowest bidder |
Tender Value
₹73.8 L
EMD Value
₹1.8 L
Closing Date
13 Aug 2020, 3:00 pmClosed
SE(PNW) SGTPS MPPGCL Birsinghpur
SE(PNW) SGTPS MPPGCL Birsinghpur
Round the clock O and M contract for HVAC system installed at 500 MW Unit at SGTPS, MPPGCL, Birsinghpur
2020_MPPGC_90102_1
90102
Open Tender
Electrical and Maintenance Works
Lump-sum
730 days
SGTPS MPPGCL BIRSINGHPUR UMARIA
Status of Bidder as per NIT clause 3 a, Copies of previously executed orders as per NIT clause 3 b, Copy of EPF and GST registration, Proof of average annual turnover as per NIT clause 3 e, Undertaking on NJS worth Rs. 100 as per NIT clause 3 f
11 documents required · 11 mandatory
₹2,000
Payable To Sr AO SGTPS MPPGCL Birsinghpur
₹1.8 L
Yes
22 Jul 2021
19 Jun 2020
18 Aug 2020
19 Jun 2020
13 Aug 2020
19 Jun 2020
SGTPS Birsinghpur
Round the clock Operation Contract for Air conditioning system of Main AC Plant, VFD Room, GCR Room & CPU Room (Consisting of HVAC System VAM chiller, Screw Chiller, Recip. chillers, Pumps, AHU, Cooling Towers along with Associated Auxiliaries) and package AC of 5.5, ton Split AC of Capacity 3T & 1.5T, installed at 1X500 MW, Unit No.5, SGTPS, MPPGCL, Birsinghpur. Total – 640 TR
Round the clock Maintenance Contract for Air conditioning system of Main AC Plant, VFD Room, GCR Room & CPU Room (Consisting of HVAC System VAM chiller, Screw Chiller, Recip. chillers, Pumps, AHU, Cooling Towers along with Associated Auxiliaries) and package AC of 5.5 ton, Split AC of Capacity 3T & 1.5T, installed at 1X500 MW, Unit No.5, SGTPS, MPPGCL, Birsinghpur. Total – 640 TR
AIR PERFECTION
Sterling and Wilson Pvt Ltd
Zamzam Refrigeration And Air-conditioning
Extreme Comfort Engineers Private Limited
SHINRYO SUVIDHA ENGINEERS INDIA PRIVATE LIMITED
Bidder Name
Blue star ltd
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .