Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.5 LAccepted-Finance AT KUCHANA POST KUCHANA TAH BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | MAHARASHTRA | 442503 | ₹25.5 L | L-1 | Accepted-Finance Due to L-1 bidder. |
| 2 | L-2₹26.0 LRejected-Finance 2528 65 WARD NO 6 NIRMAL NAGAR HINGNA NAGPUR 441110 | NAGPUR | NAGPUR | MAHARASHTRA | 441110 | ₹26.0 L | L-2 | Rejected-Finance Due to L-2 bidder. |
| 3 | L-3₹26.9 LRejected-Finance TILAK CHOWK WARORA TEHSIL WARORA DISTRICT CHANDRAPUR MS 442907 | WARORA | CHANDRAPUR | MAHARASHTRA | 442907 | ₹26.9 L | L-3 | Rejected-Finance Due to L-3 bidder. |
| 4 | L-4₹29.7 LRejected-Finance AT KUCHANA POST KUCHANA TAH BHADRAWATI DISTRICT CHANDRAPUR MS 442503 | CHANDRAPUR | MAHARASHTRA | 442503 | ₹29.7 L | L-4 | Rejected-Finance Due to L-4 bidder. |
Tender Value
₹37.6 L
EMD Value
₹47,100
Closing Date
23 May 2026, 5:00 pmClosed
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Providing protection wall and allied works for temporary hume pipe culvert at Dahiwal Nallah for Railway Siding access road at Yekona-I and II OCM under Amalgamated Yekona Sub Area of Majri Area.
2026_WCL_359410_3
ma9511cive003-26-27/070 Dated 11052026
Open Tender
Civil Works - Others
30 days
Yekona Sub Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹47,100
16 Jun 2026
12 May 2026
25 May 2026
12 May 2026
23 May 2026
13 May 2026
12 May 2026 - 19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soils | - | Cum | - | - |
| 2 | Boulder and moorum filling in plinth including cost of all materials & labour complete as per instruction of Engineerincharge(100cft boulder &40cft moorum for 100cft finished work) including watering ,ramming and consolidation complete | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | - | Cum | - | - |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete | - | Sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc | - | Sqm | - | - |
| 9 | Supplying and placing at position empty cement bags filled with OB/loose earth stitching the bag with thread and placing in position as directed complete as per instruction of engg-in-charge. | - | Nos | - | - |
| 10 | Deployment of excavator machine ( JCB of equivalent) including cost of opertator deisel , mobil oil etc. for levelling / road sides excavation and stacking within a lead of 50 meter etc. all complete job as per instructions of E.I.C | - | Hours | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.02 MB
Tendernotice_2.pdf
PDF • 2.81 MB
BOQ_372283.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid