| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Fee/PreQual/Technical/Finance | -15.99% | ₹3.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.7 L+₹15,885.28 (4.45%)Admitted-Fee/PreQual/Technical/Finance | -12.25% | ₹3.7 L+₹15,885.28 (4.45%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.3 L
EMD Value
₹8,500
Closing Date
3 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Construction of Washroom/Public Toilet at Bargah Abul Fazlul Abbas in Hassan Abad at Ward 63
2026_HAUDD_316625_17
SHORT Term NOTICE INVITING ETENDER No. 17 of 2026-2027 Dated 17.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Fazlul Abbas in Hassan Abad at Ward 63
PLEASE REFER TO TENDER DOCUENT
2 documents required · 2 mandatory
₹210
FA/CAO AC NO 0216010200000007
₹8,500
10 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing washroom including breaking and removal of R.C.C roof/slab brick masonary walls floors and wall tiles sanitary fittings such as water closets washbasin taps piping (G.I/P.V.C) plum bing and drainage constructions doors stacking of servicable material as directed and disposal of unserviciable material to the approved dumping ground all complete including labour tools transportation and handling as per the directions of Engineer In Charge | 1 | Job | 20,000 | ₹20,000 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge 1:3:6 or richer mix (i/c equivalent design mix) | 3 | Cum | 1,725.2 | ₹5,175.6 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil 50 meter beyond 1 m from cutting edge. | 8.27 | Cum | 479.3 | ₹3,963.81 |
| 4 | Providing & laying stone soiling including compacting, watering including all carriages of material complete | 2 | Cum | 850 | ₹1,700 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.9 | Cum | 5,202.9 | ₹4,682.61 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.44 | Cum | 6,591.25 | ₹16,082.65 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 6.08 | Cum | 7,571.55 | ₹46,035.02 |
| 8 | Extra for bricks work with common burnt clay bricks/cement concrete bricks | 6.08 | Cum | 1,455.65 | ₹8,850.35 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 1.36 | Cum | 9,821.85 | ₹13,357.72 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 129.57 | Kg | 115.35 | ₹14,945.9 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_1034596.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .