Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹37.5 L
EMD Value
₹75,100
Closing Date
27 Feb 2023, 3:00 pmClosed
AGM (CE), FCI RO (Mah)
FCI RO (Mah)
Systematic Maintenance Contract of Railway Siding at FSD Wardha during the year 2023-24
2023_FCI_741325_1
RO MH-22.0044.0(21.0)/1/2022-CIVI Engi - WARDHA
Open Tender
Civil Works
Item Rate
365 days
FSD Wardha
Please refer tender document
3 documents required · 3 mandatory
₹0
₹75,100
23 Mar 2023
18 Feb 2023
28 Feb 2023
18 Feb 2023
27 Feb 2023
18 Feb 2023
18 Feb 2023 - 27 Feb 2023
Amount
Systematic maintenance of Railway track in the private Railway Siding at FCI Wardha for all items as included in the Technical specification Para No. 3.00 to 3.9. on annual programme basis.
Supply of 60 Kg pre-stressed (pre-tensioned type) mono-block concrete sleepers (Class-I) for 52/60 Kg rail section. Broad gauge, as per RDSO drawing No T-2496 (with latest alterations, if any) and IRS specification T-39 (with latest alterations, if any) and as per directions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate in-cludes cost of all materials, labour, loading, trans-portation, unloading, stacking, taxes, octroi, levies, inspection charges etc., complete (should be fit for track circuit) (Note: All the materials should be supplied within 3 months from the date of issue of work order).
Supply of Elastic Rail Clips (Class-I) for 52/60 Kg rail section on 52/60 kg BG PSC sleepers as per RDSO Drg No. T-3701 (with latest alterations, if any) and confirming to IRS specification T-31 (with latest alterations, if any) and as per directions of Engi-neer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stack-ing, taxes, octroi, levies, inspection charges etc. complete. (Note: All the materials should be sup-plied within 3 months from the date of issue of work order) (One set constitutes of two inner & two outer clips)
Supply of Metal Liners (Class-I) for use with ERC for 52/60 Kg rail section on 52/60 kg BG PSC sleep-ers as per RDSO Drg No T-3741 & T-3742 (with lat-est alterations, if any) and confirming to IRS speci-fication T-56 (with latest alterations, if any) and as per directions of Engineer-in-Charge, duly inspect-ed by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, unloading, stacking, taxes, octroi, levies, inspec-tion charges etc, complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order. (One set constitutes of two inner & two outer clips)
Supply of Grooved Rubber Sole Plates (Class-I) for 52/60 Kg rail section on 52/60 kg BG PSC sleepers as per RDSO Drg. No T-3703 (with latest altera-tions, if any) and confirming to IRS spec-ification T-47 (with latest alterations, if any) and as per direc-tions of Engineer-in-Charge, duly inspected by Railways or its authorized inspecting agency at manufacturers work site. The rate includes cost of all materials, labour, loading, transportation, un-loading, stacking, taxes, octroi, levies, inspection charges etc., complete. (Note: All the materials should be supplied within 3 months from the date of issue of work order). (One set constitutes two nos.)
Supplying and stacking of approved quality of stone ballast of 50 mm gauge clean, angular, hard and durable track ballast as per RDSO specification and stacking the same on cess of the formation or toe of the bank or at suitable place as per direc-tions of Engineer-in- Charge. The rate includes all cost of lead, lift, royalty, taxes and duties and all incidental charges, testing in lab complete as appli-cable. Tools and plants and screens of approved mesh and dimensions required for inspection and passing at the time of measurements/ supply are to be arranged by the contractor. The rate also includes leveling of ground, if necessary, where the ballast are to be stacked and as directed by Engineer-in- Charge. (Note All the materials should be supplied within 3 months from the date of issue of work order).
Replacement of old CST-9 sleepers in BG track with PSC sleepers with all fittings complete to specified gauge & cross level with contractor's tools includ-ing packing and dressing of ballast, as directed by Engineer in-charge. Released materials shall be neatly stacked and handed over.
Credit for taking away dismantled unserviceable/ obsolete railway materials as is where is basis in-cluding GST etc. complete. CST 9 sleepers
Ms P B KUNDU
B VIJAYA SHEKAR REDDY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .