| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 Cr+₹13.2 L (5.89%)Rejected-Finance | ₹2.4 Cr+₹13.2 L (5.89%) | L2 | Rejected-Finance Highest Quoted |
| Sl No | Description | Qty | Unit | MVT Gopal L1 | SIVA KUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete. Narrow Foundations - First Depth Upto 2.00M | 883 | M3 | 206 ₹1,81,898 Lowest | 211 ₹1,86,313 |
| 2.00 | Open Earth Work Excavation | 64 | M3 | 103 ₹6,592 Lowest | 106 ₹6,784 |
| 3.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 78 | M3 | 1,987 ₹1,54,986 Lowest | 2,037 ₹1,58,886 |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 325 | M3 | 5,770 ₹18,75,250 Lowest | 5,914 ₹19,22,050 |
| 5.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | 1,021 | M2 | 494 ₹5,04,374 Lowest | 506 ₹5,16,626 |
| 6.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc. | 616 | M2 | 1,227 ₹7,55,832 Lowest | 1,258 ₹7,74,928 |
| 7.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers. Upto Basement | 184 | M3 | 8,750 ₹16,10,000 Lowest | 8,969 ₹16,50,296 |
| 8.00 | Ground Floor | 14 | M3 | 8,750 ₹1,22,500 Lowest | 8,969 ₹1,25,566 |
| 9.00 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification | 19.8 | Mt | 89,883 ₹17,79,683.4 Lowest | 92,130 ₹18,24,174 |
| 10.00 | Plain Cement Concrete 1:1.5:3 (one part of cement, one point five part of Crushed Stone Sand (M- Sand) and three part of coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 251 | M3 | 7,786 ₹19,54,286 Lowest | 7,981 ₹20,03,231 |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
3 Jun 2025, 3:00 pmClosed
Executive Officer
Karimangalam Town Panchayat
Construction of Cattle Market in Ward No 3 at Karimangalam
2025_DTP_561007_1
589/2025/A1
Open Tender
Civil Works
Works
Karimangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.7 L
Yes
Karimangalam
10 Nov 2025
23 May 2025
4 Jun 2025
23 May 2025
3 Jun 2025
23 May 2025
30 May 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .