Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | ₹13.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.0 LRejected-Finance | ₹14.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹14.2 LRejected-Finance | ₹14.2 L | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BALAJI TRADERS L2 | M/S SHRI BALAJI CONSTRUCTION L3 | OM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in embankment by power transported earth with a lead up to 4 KM including excavation, loading, unloading,dressing and all lifts complete | 670 | Cum. | 291 ₹1,94,970 Lowest | 327.66 ₹2,19,530.86 | 300 ₹2,01,000 |
| 2.00 | Dewatering for Foundation E/W,Concrete & Brick Work including Boring Pump Set / fuel and Pump Operating staff etc incuding all. | 4,000 | Hrs./HP | 29 ₹1,16,000 | 33.52 ₹1,34,080 | 20 ₹80,000 Lowest |
| 3.00 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. | 139.5 | Cum. | 83 ₹11,578.5 | 93.02 ₹12,976.01 | 50 ₹6,975 Lowest |
| 4.00 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. | 62.5 | Cum. | 3,134 ₹1,95,875 Lowest | 3,502.5 ₹2,18,906.25 | 3,700 ₹2,31,250 |
| 5.00 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 117.3 | Cum. | 5,140 ₹6,02,922 | 4,631.79 ₹5,43,308.97 | 4,500 ₹5,27,850 Lowest |
| 6.00 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. | 56.5 | Sqm | 630 ₹35,595 | 703.92 ₹39,771.48 | 400 ₹22,600 Lowest |
| 7.00 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. | 1.12 | M.T | 71,000 ₹79,520 | 59,772.02 ₹66,944.66 Lowest | 65,000 ₹72,800 |
| 8.00 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. | 30.5 | Cum | 4,618 ₹1,40,849 | 4,962.3 ₹1,51,350.15 | 4,500 ₹1,37,250 Lowest |
| 9.00 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 123.4 | Sqm | 104 ₹12,833.6 | 116.14 ₹14,331.68 | 50 ₹6,170 Lowest |
| 10.00 | Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work. | 4 | Mtr. | 85 ₹340 Lowest | 96.37 ₹385.48 | 100 ₹400 |
Tender Value
₹16.9 L
EMD Value
₹34,000
Closing Date
25 May 2026, 3:00 pmClosed
EE, DD-1, Meerut
O/O EE, DD-1, Meerut
As per NIT
2026_UPIDC_1150395_2
01/EE/2026-27
Open Tender
Civil Works
Piece-work
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹34,000
20 Aug 2026
19 May 2026
25 May 2026
19 May 2026
25 May 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in embankment by power transported earth with a lead up to 4 KM including excavation, loading, unloading,dressing and all lifts complete | 670 | Cum. | - | - |
| 2 | Dewatering for Foundation E/W,Concrete & Brick Work including Boring Pump Set / fuel and Pump Operating staff etc incuding all. | 4,000 | Hrs./HP | - | - |
| 3 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. | 139.5 | Cum. | - | - |
| 4 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. | 62.5 | Cum. | - | - |
| 5 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 117.3 | Cum. | - | - |
| 6 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. | 56.5 | Sqm | - | - |
| 7 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. | 1.12 | M.T | - | - |
| 8 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. | 30.5 | Cum | - | - |
| 9 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 123.4 | Sqm | - | - |
| 10 | Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work. | 4 | Mtr. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
BOQ_2154049.xls
BOQ • 0.28 MB
TD2.pdf
Tender Documents • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].