Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92.7 CrAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹89.2 Cr
EMD Value
₹1.8 Cr
Closing Date
16 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. Chief Engineeer PWD Zone Tonk
Addl. Chief Engineeer PWD Zone Tonk
Strengthening and Widening Work on Baroni Siwar Adalwara Sawai Madhopur Bhuri Pahari Kudgaon Road KM 26/0 to 66/0, 74/0 to 78/0 and 94/0 to 107/500 (SH-122)
2022_CEPWD_287204_3
NIT No. 08/2022-23 ACE PWD Zone Tonk
Open Tender
Civil Works
Percentage
450 days
Sawai Madhopur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Payment by Egas Site on Office ID 4075
₹1.8 Cr
Yes
Addl. Chief Engineeer PWD Zone Tonk
25 Aug 2022
18 Jul 2022
17 Aug 2022
18 Jul 2022
16 Aug 2022
18 Jul 2022
12 Aug 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) by mechanical means in area of throney jungle | - | Hect | - | - |
| 2 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 0.29 | cum | - | - |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 0.29 | cum | - | - |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 0.29 | Cum | - | - |
| 5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. | 0.29 | Sqm | - | - |
| 6 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means Bitumenous course | - | Cum | - | - |
| 7 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means Granular course | - | Cum | - | - |
| 8 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 1 | Cum | - | - |
| 9 | Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge. | - | No | - | - |
| 10 | Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of sub-base/Base) By Mix in Place Method For 53 mm maximum size | 1 | cum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 4.21 MB
Tendernotice_3.pdf
PDF • 8.60 MB
BOQ_509758.xls
BOQ • 0.34 MB
Technical-Bid-5.pdf
Tender Documents • 0.89 MB
Rate-Analysis.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .