| 1 | L1₹13.2 LAccepted-AOC | ₹13.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.4 LRejected-AOC | ₹13.4 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Contractor not willing to join the tender |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Contractor not willing to join the tender |
| Sl No | Description | Qty | Unit | Amutha S L2 | GM Constructuons L1 |
|---|---|---|---|---|---|
| 1.00Construction of Multi Purpose Center Building at Thalanatham H/o Thalanatham | |||||
| 2.00 | 1. EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.(Hard Soil)
i) Column | 31.64 | cum | 263.75 ₹8,345.05 | 261.14 ₹8,262.47 |
| 3.00 | 2. Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 4.8 | Cum | 1,898.25 ₹9,111.60 | 1,879.46 ₹9,021.41 |
| 4.00 | 3. Refilling the basement with excavated earth including all labour charges for filling as per standard specifications | 16.5 | Cum | 45.85 ₹756.53 | 45.39 ₹748.94 |
| 5.00 | 4. Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 13.04 | Cum | 5,539.19 ₹72,231.04 | 5,484.34 ₹71,515.79 |
| 6.00 | 5. Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3
I)Basement | 9.06 | Cum | 6,122.31 ₹55,468.13 | 6,061.69 ₹54,918.91 |
| 7.00 | II) Walls Above Basement (Super Structure) | 14.46 | Cum | 6,122.31 ₹88,528.60 | 6,061.69 ₹87,652.04 |
| 8.00 | 6. Supplying and erecting centering shuttering including necessary supports for plane etc., complete.
i) Below GL | 40.86 | Sqm | 547.45 ₹22,368.81 | 542.03 ₹22,147.35 |
| 9.00 | II) Above GL | 109.92 | Sqm | 1,094.89 ₹1.2 L | 1,084.05 ₹1.2 L |
| 10.00 | 7. Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 2.05 | Cum | 91,908.19 ₹1.9 L | 90,998.21 ₹1.9 L |
Tender Value
₹13.6 L
EMD Value
₹13,570
Closing Date
30 Dec 2025, 3:00 pmClosed
Block Development Officer(BP), Kadathur
Block Development Officer(BP), Kadathur
Construction of Multi Purpose Center Building at Thalanatham H/o Thalanatham
2025_RDTN_634532_1
Roc.No.2309/2025/A3 - MLACDS-2025-26
Open Tender
Civil Works
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
3 documents required · 3 mandatory
₹0
₹13,570
7 Mar 2026
19 Dec 2025
30 Dec 2025
19 Dec 2025
30 Dec 2025
19 Dec 2025
Construction of Multi Purpose Center Building at Thalanatham H/o Thalanatham
1. EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed.(Hard Soil) i) Column
2. Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
3. Refilling the basement with excavated earth including all labour charges for filling as per standard specifications
4. Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
5. Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3 I)Basement
II) Walls Above Basement (Super Structure)
6. Supplying and erecting centering shuttering including necessary supports for plane etc., complete. i) Below GL
II) Above GL
7. Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing
8. Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., as directed by the departmental officers complete complying with standard specifications. i) For foundation and basement
ii) Walls Above Basement (Super Structure)
9. Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chips for 40mm thick including cost and conveyance of all materials and labours etc., complete
10. Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.
11. Paving the Floor with scratch proof Design Colour ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
12. Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. The Glazed tiles should be got approved from the Departmental officers before execution.
13. Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
14. Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing etc., Completed.
15. Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
16. Finishing the top of roof with one course of PRESSED TILES of size 23cm X 23cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
17. Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
18. Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete
19. Supplying of steel doors, windows, ventilators etc., with best approved best quality etc., complete complying with standard specifications and as directed by the departmental officers. i) Doors D1
ii) Toilelt Doors D2
iii) Window W(1.00x1.30)m
iv) Ventilator V (0.90 x 0.60m)
20. Supplying and Fixing Rolling Shutter including all charges etc Completed
21. Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
22. Labour Charges for Fixing the Doors inculding all Charges etc..
23. Labour Charges for Fixing the Steel Window inculding all Charges etc..
24. Supplying & fixing with cuddapah slabs 20-30mm thick for cup board including all cost and conveyance and all labour charges etc .comp.
25. Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia
26. Supplying and fixing in positon Indian Water Closet (Oriya type) of size 580 x 440mm colour glazed earthern ware of approved quality and brand with "P" or "S" trap conforming to BIS etc., complete complying with standard specifications and as directed by the departmental officers.
27. Provision for Water supply arrangements
28. Provision for Rain water harvesting structure
29. Provision for Electrification
I) Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC Open Light point / fan point (For electronic Regulator) SD 18
II). Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 36
III) Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 64
IV) Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 69
V) Supply and fixing of WT bulk head fitting with guard ( Philips / Bajaj / Crompton / K Lite ) suitable for incandescent lamp with 60 W bulb.SD 84
VI) Supply and fixing of CFL bulb SD 80
VII) Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
VIII) Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with conduit pipe suspension from the ceiling with PVC unsheathed copper leads from terminals tot he fitting with tube SD88
IX) Supply and fixing of 16 Amps DPIC Switch of 500 V with fuse and neutral (Side Handle) on suitable TW box PWD Earthing SD 142
X) Supply and fixing of TNEB Meter board SD 125
30. Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_759261.xls
BOQ • 0.35 MB
Pricebid1.pdf
Tender Documents • 0.42 MB
Techbid1.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid