| 1 | L1₹2.8 LAccepted-AOC 3 6E PARK JUNCTION THIRUVARAMBU | ₹2.8 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | NISSI ELECTRICALS L1 |
|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 10 | Each | 6,000 ₹7,080 |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 10 | per pit | 7,500 ₹8,850 |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 10 | per pole | 8,000 ₹9,440 |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 10 | Each Pole | 8,000 ₹9,440 |
| 5.01 | Loading&unloading of 8m PSC pole | 26 | Each | 10,400 ₹12,272 |
| 6.01 | Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground | 26 | per pit | 13,000 ₹15,340 |
| 7.01 | Erection of 8m PSC pole in Normal Ground | 26 | per pole | 14,300 ₹16,874 |
| 8.01 | Transportation of 8m PSC pole from road side to pole pit upto 2KM | 26 | Each Pole | 15,600 ₹18,408 |
| 9.01 | Set right of HT/LT leaning poles | 4 | Each | 1,800 ₹2,124 |
| 10.01 | Set right of LT leaning poles | 8 | Each | 2,400 ₹2,832 |
Tender Value
Refer Docs
EMD Value
₹2,810
Closing Date
19 Jan 2026, 2:00 pmClosed
EE/TKY
Tneb tky
Natural calamity estimate for the replacement of 10 nos damaged 9 mtr PSC poles by healthy poles at various locations damaged due to fallen of trees on 23 05 2025 to 30 05 2025 under Urban Kulasekharam Section in Thuckalay division
2026_EB_639015_1
EE/D/TKY/ETW 23/Dt.03.01.2025
Open Tender
Electrical Works
90 days
EE/TKY
A s specified tender
3 documents required · 3 mandatory
₹0
₹2,810
Yes
6 Mar 2026
3 Jan 2026
20 Jan 2026
4 Jan 2026
19 Jan 2026
4 Jan 2026
4 Jan 2026 - 19 Jan 2026
Loading&unloading of 9m PSC pole
Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground
Erection of 9m PSC pole in Normal Ground
Transportation of 9m PSC pole from road side to pole pit upto 2KM
Loading&unloading of 8m PSC pole
Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground
Erection of 8m PSC pole in Normal Ground
Transportation of 8m PSC pole from road side to pole pit upto 2KM
Set right of HT/LT leaning poles
Set right of LT leaning poles
Coil earthing per pole & pole earthing
Concreting of poles as per board standards(2'*2'*5'). The material such as sand jelly etc have to be supplied by the contractor cement supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges for placing transporting of sand jelly from box and water curing for 14 days etc complete)
Drilling/less than 23mm hole per hole/slatted hole
Ordinary tree clearance
Erection of Single phase Service connection
Dismantling of Single phase Service connection
Dismantling & refixing of V X arm 4.5 feet
Dismantling & refixing of TI fittings
Dismantling & refixing of HT pin insulator
Dismantling & refixing of HT Disc
Dismantling & refixing of LT S phase cross arm
Dismantling & refixing of LT 3 phase cross arm
Dismantling & refixing of LT pin insulator
Dismantling & refixing of shackle
Dismantling & refixing of aluminium knob
Dismantling & Restringing of LT ACSR 7/2.59 conductors in pin point
Dismantling & Restringing of HT ACSR 7/4.09 conductors in pin point
Dismantling of 9mtr PSC pole
Dismantling of 8mtr RCC,REC, PSC &metal pole including the closing of the pit
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 1.35 MB
BOQ_764807.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid