| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹9.1 LRejected-Finance C O R WALL NEAR GOVT SR SEC SCHOOL SANJAULI IN WARD NO 17 BENMORE | ₹9.1 L | L2 | Rejected-Finance Higher Bidder |
| 3 | L3₹10.6 LRejected-Finance | ₹10.6 L | L3 | Rejected-Finance Higher Bidder |
| 4 | L4₹10.9 LRejected-Finance | ₹10.9 L | L4 | Rejected-Finance Higher Bidder |
| 5 | Not Admitted-Finance BABU RAM THAKUR NIWAS BELOW UTTAM GAS AJANCY DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | - | - | Not Admitted-Finance Others-site Inspection Not Enclosed |
| Sl No | Description | Qty | Unit | Sunil Khachi L3 | Suresh Vekta L4 | GOVIND SINGH L2 | Rahul Sharma L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / Manual means in over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site (To be arranged by contractor) as Directed by DFOTheog. All kind of Soils | 14.95 | Per cubic meter | 151 ₹2,257.45 | 155 ₹2,317.25 | 130 ₹1,943.50 | 100 ₹1,495 |
| 2.00 | Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means in foundation and trenches (exceeding 30 cm in depth, 1.5 m in width as well s 10sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site ( To be arranged by contractor) as Directed by DFO Theog. | 17.5 | Per cubic meter | 210 ₹3,675 | 218 ₹3,815 | 170 ₹2,975 | 100 ₹1,750 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement: 5 fine sands: 10 graded stone aggregate 40mm nominal size) complete including carriage of materials within all leads and lifts as per direction of DFO Theog. | 1.5 | Per cubic meter | 4,701 ₹7,051.50 | 4,750 ₹7,125 | 5,600 ₹8,400 | 4,600 ₹6,900 |
| 4.00 | Centering ad shuttering including strutting, propping etc. and removal of form work for: Foundation, footings and bases for columns. | 14.3 | Per cubic meter | 340 ₹4,862 | 345 ₹4,933.50 | 214.5 ₹3,067.35 | 10 ₹143 |
| 5.00 | Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, foundations under plinths, floors etc. in the required thickness, and ramming and compacting manually for all leads & lifts, all complete as per direction of DFO Theog. | 14.58 | Per cubic meter | 1,260 ₹18,370.80 | 1,265 ₹18,443.70 | 1,240 ₹18,079.20 | 800 ₹11,664 |
| 6.00 | Reinforced cement concrete work in walls, (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. above plinth level up top floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20mm nominal size) | 3.35 | Per cubic meter | 8,100 ₹27,135 | 8,150 ₹27,302.50 | 7,625 ₹25,543.75 | 6,500 ₹21,775 |
| 7.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering ad shuttering - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand): 4 graded stone aggregate 20 mm nominal size) | 1.44 | Per cubic meter | 6,600 ₹9,504 | 6,700 ₹9,648 | 5,949 ₹8,566.56 | 5,500 ₹7,920 |
| 8.00 | Random rubble masonry with hard stone in foundation and superstructure above plinth level and up to floor five level, including leveling up with cement concrete 1:6:12(1 cement :6 coarse sand: 12 graded stone aggregate 20 mm nominal size) at window sills, celling level and the like. Cement mortar 1:6 (cement: 6 coarse: sand) | 21.87 | Per cubic meter | 6,300 ₹1.4 L | 6,350 ₹1.4 L | 5,835 ₹1.3 L | 4,788 ₹1.0 L |
| 9.00 | Coursed rubble masonry (first sort) with hard stone in foundation, plinth and above plinth in over areas up to 5-meter height with: cement mortar 1:6 | 19.2 | Per cubic meter | 6,300 ₹1.2 L | 6,400 ₹1.2 L | 5,700 ₹1.1 L | 5,000 ₹96,000 |
| 10.00 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with cement mortal 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade: One face dressed, (Choice of the stone as per the direction of DFO Theog | 6.4 | Per cubic meter | 34,000 ₹2.2 L | 34,500 ₹2.2 L | 33,400 ₹2.1 L | 27,000 ₹1.7 L |
Tender Value
Refer Docs
EMD Value
₹18,666
Closing Date
3 Apr 2026, 5:00 pmClosed
DFO Theog
O/o Forest Division Theog Pin 171201
Construction of Entry Gate No. 4 Deshu Peak Kufri (Theog Division)
2026_FD_131950_1
AE/2025-26
Open Tender
Civil Works - Others
90 days
Deshu Peak (EDC Kufri-Mahasu)
7 documents required · 7 mandatory
₹500
Payable To DFO Theog
₹18,666
7 Apr 2026
19 Mar 2026
6 Apr 2026
19 Mar 2026
3 Apr 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / Manual means in over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site (To be arranged by contractor) as Directed by DFOTheog. All kind of Soils | 1 | Per cubic meter | - | - | BI01010001010000000000000515BI0100001113 |
| 2Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means in foundation and trenches (exceeding 30 cm in depth, 1.5 m in width as well s 10sqm on plan) including getting out and disposal of excavated earth all lead lift and sorting out useful and unuseful material and transportation of unuseful material for disposing at dumping site ( To be arranged by contractor) as Directed by DFO Theog. | ||||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement: 5 fine sands: 10 graded stone aggregate 40mm nominal size) complete including carriage of materials within all leads and lifts as per direction of DFO Theog. | ||||||
| 4Centering ad shuttering including strutting, propping etc. and removal of form work for: Foundation, footings and bases for columns. | ||||||
| 5Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, foundations under plinths, floors etc. in the required thickness, and ramming and compacting manually for all leads & lifts, all complete as per direction of DFO Theog. | ||||||
| 6Reinforced cement concrete work in walls, (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. above plinth level up top floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20mm nominal size) | ||||||
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering ad shuttering - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand): 4 graded stone aggregate 20 mm nominal size) | 1 | Per cubic meter | - | - | BI01010001010000000000000515BI0100001119 |
| 8Random rubble masonry with hard stone in foundation and superstructure above plinth level and up to floor five level, including leveling up with cement concrete 1:6:12(1 cement :6 coarse sand: 12 graded stone aggregate 20 mm nominal size) at window sills, celling level and the like. Cement mortar 1:6 (cement: 6 coarse: sand) | ||||||
| 9 | Coursed rubble masonry (first sort) with hard stone in foundation, plinth and above plinth in over areas up to 5-meter height with: cement mortar 1:6 | 1 | Per cubic meter | - | - | BI01010001010000000000000515BI0100001121 |
| 10Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) including pointing with cement mortal 1:2 (1 white cement: 2 stone dust) with an admixture of pigment matching the stone shade: One face dressed, (Choice of the stone as per the direction of DFO Theog | ||||||
stage.html
html • 0.06 MB
technical_195125.pdf
techsummary_195125.pdf
finance_195125.pdf
BOQ Comparative Chart
xlsx
finsummary_195125.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_195125.xls
BOQ • 0.26 MB
DNIT.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid