| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Least Rate Quoted Bid Accepted |
| 2 | L2₹1.4 Cr+₹1.3 L (0.93%)Rejected-AOC 609 702 | NAGAPATTINAM | TAMIL NADU | 609702 | ₹1.4 Cr+₹1.3 L (0.93%) | L2 | Rejected-AOC High Rate Quoted The Bidder Rejected |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
5 May 2023, 3:00 pmClosed
Additional Collectot Dev
DRDA, Collectorate Campus, Nagapattianm
Stregthenning of 2 Roads at Vedaranyam Block Package No 36 Under MGSMT Scheme
2023_RDTN_307241_1
MGSMT/Tender/2023/NGT/Pkg-36
Open Tender
Civil Works
Item Rate
90 days
Vedaranyam Block
As per the Technical Bid
8 documents required · 8 mandatory
₹0
₹1.4 L
DRDA, Collectorate Campus, Nagapattianm
18 Jul 2023
27 Apr 2023
5 May 2023
27 Apr 2023
5 May 2023
27 Apr 2023
27 Apr 2023 - 28 Apr 2023
28 Apr 2023
Amount
01. Stregthening of Moolakkarai - Kotalivattam Link road KM 0/0-1/200 at Vedaranyam Block
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying 75mm compacted thick WBM Gr. II using 1 cum of 90mm to 22.4mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for bottom layer.
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.20mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for top layer.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II)Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.
Provision for painting the centre and edge line with Thermo elastic paint including all labour charges etc complete
Provision for HM Stone of size 0.90m x 0.15m x 0.15m
Provision for KM Stone of size 1.65m x 0.45m x 0.15m
Provision for Name board
Provision for signboard
Provision for speed breaker
Provision for RCC Slab Culvert @ Km 0/200
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and pipe culverts as per SS20B
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Above Sill
Plain Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works @
Reinforced Cement Concrete 1:1 1/2:3 mix using graded ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for concrete for deck slab concrete @ C.D. works
Supplying and fabrication to steel Fe 415 (Tor. Steel) required for reinforced cement concrete work including cost and conveyance of steel to work spot handling charges for the rods straightening cutting bending, tying grills using binding wire (No welding should be done to steel item) hoisting placing positioning binding wire, provision of space hard cover blocks necessary stays and supporting devices including labour materials hire charges for all tools and plants employed and all other incidental charges, etc. complete as per standard specification for C.D. works @ Km
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Shuttering
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Centering
Providing and fixing 6mm Bitumen felt
Providing Tar paper
Provision for Weephole pipes etc conplete
Providing gravel filling
Retaining wall CH 0/605-0/640
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and pipe culverts as per SS20B
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Above Sill
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Shuttering
Provision for Weepholes
Provision for Expansion Joint Pad etc complete
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
02. Ugradation to Chettipulam Vadakadu to Nagakudaiyan Salai KM 0/0-1/515 at Vedaranyam Block
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying 75mm compacted thick WBM Gr. II using 1 cum of 90mm to 22.4mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for bottom layer.
Providing and laying 75mm compacted thick WBM Gr. II using 1 cum of 90mm to 22.4mm IRC metal and 0.24 cum of Gravel blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurring rolling and consolidation by power roller and finishing has per MORD 405 including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefore and all other incidental charges etc., complete for bottom layer.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II)Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.
Provision for painting the centre and edge line with Thermo elastic paint including all labour charges etc complete
Provision for HM Stone of size 0.90m x 0.15m x 0.15m
Provision for KM Stone of size 1.65m x 0.45m x 0.15m
Provision for Name board
Provision for signboard
Provision for speed breaker
Provision for 3.00 m span RCC slab culvert @ ch 904
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and pipe culverts as per SS20B
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Above Sill
Plain Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works @
Reinforced Cement Concrete 1:1 1/2:3 mix using graded ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for concrete for deck slab concrete @ C.D. works
Supplying and fabrication to steel Fe 415 (Tor. Steel) required for reinforced cement concrete work including cost and conveyance of steel to work spot handling charges for the rods straightening cutting bending, tying grills using binding wire (No welding should be done to steel item) hoisting placing positioning binding wire, provision of space hard cover blocks necessary stays and supporting devices including labour materials hire charges for all tools and plants employed and all other incidental charges, etc. complete as per standard specification for C.D. works @ Km
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Shuttering
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Centering
Provision for Weephole pipes and Craft paper for Deck slab etc conplete
Provision for Expansion Joint Pad for Deck slab etc conplete
Provision for Weepholes
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
JEEVE CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .