| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.0 L+₹18,413.16 (1.03%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.2 L+₹36,826.32 (2.06%)Rejected-Finance NOT SPECIFIED | NEW DELHI | DELHI | 110001 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹18.4 L
EMD Value
₹36,900
Closing Date
30 Jul 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of chabutra and shed for shamshan ghat in Village - Jaitpur at Khasra No 257 Yea WC-06
2026_YEIDA_1168792_22
YEA/GM(PROJECT)/2026/542 DT-10/07/2026
Open Tender
Civil Works
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹36,900
10 Oct 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of Earth work , banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 UPPWD SOR-2020DSR-16/16.1 | - | Cum | 1 | - |
| 2 | Providing and laying 80mm I.S.I. Mark factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction of approved size degine, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming to IS- 15658 and IRC: SP:63. | - | Sqm | - | - |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Morth-401 | 1 | Cum | - | - |
| 4 | Cleaning jungle including uprooting of rank vegetation grass brush wood , trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to adisance of 50 m out sides | - | sqm | - | - |
| 5 | Earth work in excavation in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom. Lifts upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | - | Cum | 1 | - |
| 6 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | - | Cum | - | - |
| 7 | Finishing walls with water proffing cement paint of requires shade new work ( Two or more coat applied @ 3.84 kg /10 sqm ) new work ( three or more coats ) | - | sqm | - | - |
| 8 | M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) | - | Cum | - | - |
| 9 | concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17 | - | Cum | - | - |
| 10 | 12 mm cement plaster of mix: 1:6 (1 cement: 6 coarse sand) | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
22.pdf
Tender Documents • 1.23 MB
BOQ_2194496.xls
BOQ • 0.25 MB
550.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .