Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -25.25% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 L+₹58,239.92 (32.4%)Admitted-Finance | -1.00% | ₹2.4 L+₹58,239.92 (32.4%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 L+₹65,444.86 (36.5%)Admitted-Finance | +2.00% | ₹2.4 L+₹65,444.86 (36.5%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 L+₹67,846.51 (37.8%)Admitted-Finance | +3.00% | ₹2.5 L+₹67,846.51 (37.8%) | L4 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
18 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt. Of Balance work of Community Hall and water Tanki near Shiv Mander Sang Talab ward no 05 Panchayat Raipur Upper B Block Bhalwal under scheme CDF (2nd call)
2026_RDPR_319097_23
e-NIT No. 363 REW J of 2026-27 dated 03-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹4,800
16 Sept 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (All kinds of soil) | - | cum | 479.3 | - |
| 2 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.18 | cum | 4,826.5 | ₹15,348.27 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level | 4.51 | cum | 5,733.6 | ₹25,858.54 |
| 4 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand)
including grouting the joints with white cement and matching pigments etc. complete 600x600mm | 38.41 | sqm | 1,395.1 | ₹53,585.79 |
| 5 | 12 mm thick cement plaster of 1 cement: 6 fine sand mix. | 65.66 | sqm | 266.2 | ₹17,478.69 |
| 6 | 6mm cement plaster to ceiling of mix 1:3 | 38.41 | sqm | 241.25 | ₹9,266.41 |
| 7 | Distempering with oil bound washable distemper of approved brand and manufacture to give an
even shade on New work (two or more coats) over and including priming coat with water
thinnable cement primer | 224.07 | sqm | 164.6 | ₹36,881.92 |
| 8 | Brick Masonary with bricks of class designation 75 in superstructure mix 1:6 | 2.23 | cum | 7,571.55 | ₹16,884.56 |
| 9 | Providing and Laying c.concrete M20 using 20mm s.aggregate for RCC Slab. | 0.84 | cum | 7,788.4 | ₹6,542.26 |
| 10 | Providing Tor steel including bending,cutting,straightening & placing etc. | 83.6 | cum | 123.2 | ₹10,299.52 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1055455.xls
BOQ • 0.26 MB
363.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .