| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Rejected-Technical | Rejected-Technical Rejected |
Tender Value
₹80.4 L
EMD Value
₹1.6 L
Closing Date
29 May 2026, 3:00 pmClosed
Executive Engineer
EE/HCD-10/DDA
Annual maintenance work of Yamuna Bio-Diversity Park Phase-I
2026_DDA_910005_1
03/EE/HCD-10/DDA/2026-27
Open Tender
Civil Works
Percentage
365 days
As Per NIT
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.6 L
23 Jul 2026
23 May 2026
30 May 2026
23 May 2026
29 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/
manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 90 | cum | 177.5 | ₹15,975 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | 25 | cum | 196 | ₹4,900 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size). | 46 | cum | 6,518.6 | ₹2,99,855.6 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 6 | cum | 7,878.5 | ₹47,271 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 45 | sqm | 392.15 | ₹17,646.75 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, piers, abutments, pillars, posts and struts | 10 | sqm | 961.3 | ₹9,613 |
| 7 | Demolishing cement concrete manually/ by mechanical means including
disposal of material within 50 metres lead as per direction of Engineer -
in - charge. Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 15 | cum | 1,503.6 | ₹22,554 |
| 8 | Demolishing stone rubble masonry manually/ by mechanical means
including stacking of serviceable material and disposal of unserviceable
material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar | 15 | cum | 2,458.95 | ₹36,884.25 |
| 9 | Demolishing brick work manually/ by mechanical means including
stacking of serviceable material and disposal of unserviceable material
within 50 metres lead as per direction of Engineer-in-charge In cement mortar | 3 | cum | 2,060.2 | ₹6,180.6 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 20 | cum | 7,370.65 | ₹1,47,413 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
NIT3.pdf
Tender Documents • 1.81 MB
BOQ_956421.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .