| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.9 LAccepted-Finance | L-1 | Accepted-Finance L-1 Bidder | |
| 2 | L-2₹2.0 L+₹6,375.32 (3.29%)Rejected-Finance | L-2 | Rejected-Finance Not L-1 Bidder | |
| 3 | L-3₹2.1 L+₹11,844.91 (6.12%)Rejected-Finance VILL DRABAD PO MANJEER TEHSIL SALOONI DISTT CHAMBA H P 176312 | CHAMBA | HIMACHAL PRADESH | 176312 | L-3 | Rejected-Finance Not L-1 Bidder | |
| 4 | L-4₹2.7 L+₹79,557.61 (41.1%)Rejected-Finance | L-4 | Rejected-Finance Not L-1 Bidder | |
| 5 | L-5₹2.9 L+₹93,141.54 (48.1%)Rejected-Finance | L-5 | Rejected-Finance Not L-1 Bidder |
| Sl No | Description | Qty | Unit | Bal Singh Thakur L2 | Vishal Kumar L4 | Gargesh Kumar L7 | Abhishek Thakur L5 | sham lal L1 | RAKESH KUMAR L3 | Pooja Kumari L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos. rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) /Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm withtape (0.52 mm thick) and weight 43.478 gm/ metre. | 158.3 | meter | 39,100.1 ₹39,100.1 | 47,490 ₹56,038.2 | 50,656 ₹59,774.08 | 55,405 ₹65,377.9 | 37,200.5 ₹43,896.59 | 28,335.7 ₹33,436.13 Lowest | 98,146 ₹98,146 |
| 2.00 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand) | 26.96 | Cum | 80,529.52 ₹80,529.52 | 99,752 ₹1,17,707.36 | 1,34,800 ₹1,59,064 | 97,056 ₹1,14,526.08 | 59,716.4 ₹70,465.35 Lowest | 78,184 ₹92,257.12 | 78,184 ₹78,184 |
| 3.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 506.16 | Kg | 44,035.92 ₹44,035.92 Lowest | 45,554.4 ₹53,754.19 | 37,962 ₹44,795.16 | 48,085.2 ₹56,740.54 | 37,962 ₹44,795.16 | 39,986.64 ₹47,184.24 | 70,862.4 ₹70,862.4 |
| 4.00 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar | 2 | Cum | 1,374 ₹1,374 | 82 ₹96.76 Lowest | 160 ₹188.8 | 200 ₹236 | 830 ₹979.4 | 520 ₹613.6 | 4,000 ₹4,000 |
| 5.00 | Providing and laying cement concrete in retaining walls,return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets,coping, bed blocks, anchor blocks, plain window sills,fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size). | 6.56 | Cum | 30,090.72 ₹30,090.72 | 32,800 ₹38,704 | 33,456 ₹39,478.08 | 39,360 ₹46,444.8 | 25,026.4 ₹29,531.15 Lowest | 25,059.2 ₹29,569.86 | 40,672 ₹40,672 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 29.16 | Sqm | 4,869.72 ₹4,869.72 | 5,832 ₹6,881.76 | 5,832 ₹6,881.76 | 2,916 ₹3,440.88 | 3,353.4 ₹3,957.01 | 2,041.2 ₹2,408.62 Lowest | 12,538.8 ₹12,538.8 |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
21 Mar 2025, 5:00 pmClosed
Dy General Manager (PnC)
Procurement and Contract Wing, CPS-I Khairi Distt. Chamba (HP) 176325
Repairing of boundary wall of Kendriya Vidyalaya at CPS-1,Khairi.
2025_NHPC_851399_1
NH/CPS-1/PnC/W-1497/2024-25/ 887 Dated 01/03/2025
Open Tender
Civil Works
Works
30 days
CPS-1 KHAIRI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NHPC Limited
₹6,000
Yes
16 Sept 2025
1 Mar 2025
26 Mar 2025
1 Mar 2025
21 Mar 2025
1 Mar 2025
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos. rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) /Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm withtape (0.52 mm thick) and weight 43.478 gm/ metre.
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar
Providing and laying cement concrete in retaining walls,return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets,coping, bed blocks, anchor blocks, plain window sills,fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Bal Singh Thakur (BID ID -3191099)
RAKESH KUMAR (BID ID -3189816)
Vishal Kumar (BID ID -3191306)
Abhishek Thakur (BID ID -3190537)
Pooja Kumari (BID ID -3190356)
Gargesh Kumar (BID ID -3191250)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .