| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹28.7 L+₹1.7 L (6.46%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹28.2 L
EMD Value
₹49,800
Closing Date
4 Sept 2021, 5:00 pmClosed
XEN Electrical division No. 1 Shimla-9
The Executive Engineer Electrical Division No-1 HPPWD Shimla-9
Providing Oxygen manifold System and Oxygen Pipeline outlets in Regional Ayurvedic Hospital Chotta Shimla
2021_PWD_51662_1
PWED-AB-Tender-2021-22-3174-78 dt 25-08-2021
Open Tender
Electrical Works
Item Rate
30 days
SHIMLA KASUMPTI -9
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
E.E.Electrical Division No-I Shimla-9
₹49,800
22 May 2022
25 Aug 2021
6 Sept 2021
25 Aug 2021
4 Sept 2021
25 Aug 2021
Amount
Supplying, installation, testing and commissioning of Oxygen Manifold with 20 Nos. Pigtail pipes for 10+10 cylinders and Non-return valves complete etc. as required at site and as per technical specifications, as per HTM- 2022/02-01 of UK/NFPA99C of USA - (without cylinder) complete in all respect i/c repair work in manifold room which shall be damaged during installation of manifold etc. as required .Makes: Aktive, Becon Medaes, Draggger or as aproved by engineer in charge
Supplying, installation, testing and commissioning of fully automatic control panel designed to provide reliable interrupted supply medical gases to pipeline network of healthcare unit. The system should consists of;- Control Panel cover made of M.S. powder coated. - Compact and fully automatic manifold control system for Oxygen, - Easy to maintain and use. - Designed with both safety and continuity of flow supply at a constant pressure via two banks of bottled gas cylinders with following status monitoring. A-Bank in use (Green Indication).B- Bank ready for use (Yellow indication).C- Empty Bank (Red Indication).- Control Panel has build in LED display to indicate Normal, high & Low line pressure. - It has facility to test all above indicators working perfectly. - The control Panel includes pressure gauges (63 mm) to indicate the gas pressure of each header and pipe line distributor pressure. -Capable to provide a distribution flow rate in excess of 1500 LPM.- The control panel incorporate safety puncture in case pressure exceeds 100 psi. -In case of failure of electronic as well pneumatic system, control can be used manually through by pass system. - It should have facility to switch over from left bank to right bank. - It should CE Certified. Makes: Aktive, Becon Medaes, Dragger or as aproved by engineer in charge
Supplying, installation, testing and commissioning of Medical area Gas Alarm – As per NFPA -99 std / HTM -2022/02-01 Area Alarms are designed to include all necessary displays, factory wiring, transformers and circuitry requiring only 230 VAC primary powers. Internal voltage should be stepped down to 5 VDC and 15 VDC for control circuit Power. Voltage to external pressure or vacuum transducers should be 15 VDC The Area Alarm should have digital display facility. Each area alarm should monitor up to 6 or 12 medical gas & / or Vacuum services. Area alarm panels should be modular in design. Each gas monitored should have a light Emitting Diode (LED/LCD) display to continuously indicate actual line pressure. A vertical series of LED’s/LCD should further indicate relative line pressure. The control module should include a silence/enter button, a Test/Shift button, an Up button and a Down button. These buttons should be used to silence the audible alarm, set up the alarm panel and to test the alarm panel. The test button should test all modules one at a time. An LED/LCD on the control module should illuminate green to indicate Power on. The LED/LCD should show Normal pressure at 50 psi.apart from Normal it should also show low risk of 40 PSI as low-pressure and 60 psi as high. High risk of 30 psi as low pressure & 70 psi as High pressure. Line pressure modules should be available in dual display configuration, dual display modules should accept any combination of pressure or Vacuum. The back box should contain factory installed copper tube extensions 6” Long , 3/8” ID (1/2”OD), to accept installer furnished lines form the medical gas system. Each inlet tube should accept gas – specific DISS fittings for transducers, to prevent cross-connection. The power supply should be installed in the back box Power supply should include an on / off rocker switch and a fuse holder.The audible alarm tone should pulsate, 90 dBa at 2 meters. The audible signal should be cancelled only by the alarm silence button or fault correction. The display should remain illuminated to indicate the presence of the alarm condition. The alarm should automatically reset with the correction of the fault condition. Should a new alarm occur while the panel is silenced, the audible alarm should reactivate. The area alarm should store the last four alarm conditions in memory at the alarm panel. These conditions can be indicated by using the buttons on the alarm panel control module.The alarm should be capable to be connecte1d with the HIS system.It should be European CE with 4 digit no. / UL Listed.
Area line pressure alarm single gas
Master Alarm for Plant
Supplying, installation, testing and commissioning of MEDICAL AREA VALVE SERVICE UNIT (VALVE BOX WITH ISOLATION VALVE) AS PER ENCLOSED TECHNICAL SPECIFICATIONS ZONE VALVE BOX CE Marked having Adopter having opening by quarter turn of handle. The valve should be pneumatically tested as per for twice the working pressure and degreased for medical gas service before supply. Valve boxes should be equipped with components for shutting off and supervising individual /parts of central systems in hospital, laboratories and the like. They should be allowed the ward staff to allow isolating of the areas for maintenance and repair work. The pressure monitoring of the distribution system is done by pressure gauges. In case of emergency the door can be glass break opened or by unlocking using the key.
Providing of miscellenaous civil items such as iron work, maison work for installation & covering of complete manifold system.
Supplying, installation, testing and commissioning of Medical line valve, as per CE Certified/UL Listed as per technical specifications
Supplying, installation, testing and commissioning of GAS OUTLET POINTS as per NFPA99 latest edition TERMINAL / GAS OUTLETS Oxygen Surface mount, non interchangeable, self sealing outlets, outlets will consist of a roughing in assembly and a finishing assembly. A non removable positive- pin keying arrangement for each specific gas service. Installed in the mounting box a fully assembled brass secondary check valve. Design of outlet will be such that it will have the feature to accept of probes & push button mechanism for quick release of adaptor. The secondary check valve automatically will form a positive seal to prevent a gas flow when the finishing assembly is removed. The secondary check valve to include 7’’ (17.78cm) of 1/2’’ Type K copper tubing with a label affixed which identifies the specific gas by name and colour. A plastic cap inserted at the end of the inlet tube. Rotation of the inlet tube will allow gas connection from the top or bottom. the finishing assembly will consists of a die cast chrome plated cover plate , a machined brass housing for the primary check valve, and a positive – pin keying device to prevent accidental installation into a roughing in assembly of a dismal gas. The finishing assembly incorporates a double seal arrangement which automatically engages when a hose adapter or patient treatment device is removed from the outlet.The finishing assembly will have a color coded (specific gas) keying disc to prevent connection of hose adapters or patient treatment device to the wrong gas service. The primary check allows absolutely no gas flow to take place until the keying devices are engaged. It will be manufactured in accordance with all applicable NFPA and CGA standards. The locking device will be in the probe instead of gas outlet. Matching probe for outlets – Imported as per NFPA -99 UL Listed Matching probes to the gas outlet mentioned above. That is adapter for Oxygen N2o, Air & vacuum/ WAGD. Each adapter will have suitable barb or threads so that it can be connected to tube or flow meter/suction regulator. Adapter will have clear gas service embossed on it. It should be UL Listed. Makes: Dragger, Becon Medeas, Aktive or as approved by engineer incharge.
Supplying, installation, testing and commissioning of BPC Flow meter with Humidifier (Indian) Back Pressure Compensated flow meter will be ofaccurate gas flow measurement with following features : ∙ Control within a range of 0 – 15 lpm (calibration within +/- 10%). ∙ It will meet strict precision and durability standard. ∙ The flow meter body will be made of brass chrome plated materials.∙ The flow tube and shroud components will be made of clear, impact resistant polycarbonate.∙ Flow Tube will have large and expanded 0 – 5 lpm range for improved readability at low flows.∙ Inlet filter of stainless steel wire mesh to prevent entry of foreign particles. ∙ The humidifier bottle will be made of unbreakable polycarbonate material and autoclavable at 134 degree Centigrade temperature.∙ Will be CE Certified.
Supplying, installation, testing and commissioning of MEDICAL COPPER piping should be carried out as per international standards with utmost cleanliness. Only pipes, fittings and valves which have been degreased as per International standards should be used. Pipe fixing clamps for upto 28 mm diameter. Pipes should be non ferrous suitable for the diameter of the pipe. For the pipes of the sized above 28 mm rigid metallic hanging or cemented supports to be used.The main lines to the building to be taken overhead through metallic poles or through underground ducts with inspection removable slabs, All pipe joints should be made using inert gas flux less brazing method. All joints should be of copper to copper and should be brazed by silver brazing filler material without flux while being brazed joints shall be continuously purged with oil free dry nitrogen to prevent the formation of copper oxide on the inside surface of the joint. All pipes should be installed without springing or forcing. All pipes should be protected against mechanical injury in a manner satisfactory to authorities having jurisdiction.Test: After erection, all the new pipes cleaned or purged with the help of dry nitrogen gas. Complete system should be tested with dry nitrogen at 2 times of working pressure for 24 hours.Painting: All existing and proposed exposed pipes/should be painted with two coats of Synthetic enamel paint & color codification as per international standards. All concealed pipes to have gas identification bands / labels at appropriate distance. Similarly all pipes which need embedding in the wall should be tested /painted/labeled and properly insulated.Certification: To be certified that pipes are suitable for the particular service and complete cross connection (anti-confusion) test will be carried out.
Copper pipe size 12mm x 0.7mm Thickness
Copper Pipe size 15mmx0.9mm Thickness
Copper Pipe Size 22mm x 0.9mm Thickness
Copper pipe Size 28mm x 0.9mm thickness
Supply and fixing of SS ventilators Probes which shall be matching with existing Oxygen Outlets i/c clamping with the pipes in all respect etc
AnKServices
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .