| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Work order |
| 2 | L2₹1.2 Cr+₹2.4 L (1.99%)Rejected-Finance | ₹1.2 Cr+₹2.4 L (1.99%) | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
10 Jan 2025, 3:00 pmClosed
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
Strengthening and 5 years maintenance of one road work in Shanarpatti Block of Dindigul District TN05-15 NABARD XXX 24-25
2025_RDTN_516211_1
DIPR.5603.2024 Date 26.12.2024
Open Tender
Civil Works
Item Wise
180 days
DRDA
Strengthening and 5 years maintenance of one road work in Shanarpatti Block of Dindigul District TN05-15 NABARD XXX 24-25
3 documents required · 3 mandatory
₹0
₹1.3 L
DRDA,DINDIGUL
28 Feb 2025
2 Jan 2025
10 Jan 2025
2 Jan 2025
10 Jan 2025
2 Jan 2025
3 Jan 2025
Amount
Name of the work : 1.Strengthening the road from Thavasimadai to Sirumalai Adivaram (via) Vadugapatty in km. 0/0 -2/00KM Estimate amount : Rs.124.59 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Picking the existing worn - out WBM / BT surface using 5 - 10 cm thick including allcost andconveyance of all materials and all labour charges etc complete
Providing and Laying Gravel to a compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM/WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Macadum 50mm thick using IRC size machine broken HBG metal 0.20 cum of 26.5 - 13.2mm , 0.43 cum 13.2 - 2.36mm and 0.08 cum of 2.36mm& bvelow metal with 36kg of of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot applied themoplastic compound with Reflecorising Glass bead on Bituminous surface
Providing and fixing of KM stones for standard specification
Providing and fixing of HM stones for standard specification
Providing and fixing of Name board cum Citizen board
Providin 60cm Equilateral Trainagle Cautionary signboard
Retaining wall at Ch 0-15 and 190 -210
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenance I year
Maintenance II year
Maintenance III year
Maintenance IV year
Maintenance V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRINIVASA VARATHARAJAN (BID ID -1228851)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .