Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Fee/PreQual/Technical/Finance | -4.99% | ₹5.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.4 L+₹26,999.10 (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.4 L+₹26,999.10 (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹5.4 L+₹26,999.10 (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.4 L+₹26,999.10 (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹5.4 L+₹26,999.10 (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.4 L+₹26,999.10 (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹5.4 L+₹26,999.10 (5.25%)Admitted-Fee/PreQual/Technical/Finance JHARSUGUDA | +0.00% | ₹5.4 L+₹26,999.10 (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
7 Aug 2026, 6:00 pmClosed
EXECUTIVE OFFICER
jharsuguda municipality
boundary wall
2026_ORULB_136238_8
EO/JMC/04/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
PANCHAPADA
Scan copy of regd. cert, PAN, GST clearance cert., experience cert., and other documents as per DTCN
2 documents required · 2 mandatory
₹4,000
₹6,400
Yes
11 Aug 2026
22 Jul 2026
10 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work excavation in hard soil including moorum stony earth and earth mixed with boulder within 50 m initial lead and 1.5 m initial lift including dressing and breaking clods levelling the bed up to required depth and depositing the excavated materials with all leads and lifts T and P etc. complete as per direction of Engineer-in-charge. | - | cum | 1 | - |
| 2 | Supplying and filling in foundation and plinth with sand well watered and rammed with cost, conveyance, royalty taxes of all materials etc. complete as per direction of engineer-in-charge. | - | cum | - | - |
| 3 | Cement Concrete (1:4:8) with 4 cm size HBG metal of approved quality from approved quarry including lowering laying concrete water curing to required level not exceeding 150 mm thick including cost, conveyance, royalty taxes of all materials etc. complete as per direction of Engineer-in-charge. | - | cum | 1 | - |
| 4 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, tools and plants, water for curing etc.all complete, as per OPWD specification required for the work to finished items of work. | - | cum | - | - |
| 5 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in foundation and plinth. | - | cum | - | - |
| 6 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in super structure. | 1 | cum | - | - |
| 7 | 16 mm thick cement plaster (1:6) on brick work including all cost conveyance royalty & taxes etc. comp. to work site. | - | csqm | - | - |
| 8 | Supplying cutting straitening the bent up uncoated HYSD reinforcement including cutting bending, binding, tying the grill and placing in position as required for R.C.C. Work including cost, conveyance, royalty taxes of rod and binding wire of 18 to 20 gauge etc. etc. complete as per direction of Engineer-in-charge of Rod and no separate payment will be made towards the weight of binding wire. | 1 | qntl | 1 | ₹1 |
| 9 | Weather coat painting two coats with 100% Acrylic emulsion paint (1st. quality) exterior grade over a coat of water bond cement primer of approved make & shade manufactured by reputed manufacturer like (NEROLAC/ ASIAN/ BERGER/ DULOX) or equivalent to make an ever finished surface in all floor and height with all scaffolding and staging charges including cost, conveyance & taxes of all materials labour & T&P etc. complete as directed by the Engineer-in-charge. | - | sqm | - | - |
| 10 | Painting two coats over a coat of primer to wood / iron work including all charges. | 1 | sqm | - | - |
stage.html
html • 0.03 MB
finance_602255.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.16 MB
NIT.pdf
Tender Documents • 4.15 MB
BOQ_602255.xls
BOQ • 0.30 MB
DATECORRIGENDUM.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .