Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 LAccepted-AOC | ₹36.1 L Quoted ₹30.6 L | L1 | Accepted-AOC L1 |
| 2 | L₹30.7 LRejected-Finance MAU KAZIJADGAN KARAL ROAD CHANDPUR DISTRICT BIJNOR U P | CHANDPUR | BIJNOR | UTTAR PRADESH | ₹30.7 L | L | Rejected-Finance L2 |
Tender Value
₹36.3 L
EMD Value
₹73,000
Closing Date
20 May 2026, 12:00 pmClosed
EEREDBIJNOR
EEREDBIJNOR
Road construction work in Village Thatjat Kasmabad, proceeding from the Canal Road running alongside the Plywood Factory, and extending towards the paved road located on the outskirts of the village.MLA-Dhampur
2026_REDUP_1142181_19
04/EE/RED/DATE-01-04-2026
Open Tender
Civil Works - Roads
Percentage
180 days
EEREDBIJNOR
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,354
₹73,000
Yes
5 Aug 2026
29 Apr 2026
20 May 2026
29 Apr 2026
20 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 3000 M as per Technical Specification Clause 301.5 | 672.49 | Cum. | 195.42 | ₹1,31,418 |
| 2 | Construction of Granular Sub Base by providing Well graded material, spreading in uniform layers with Motor grader/Tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with Rotavator at OMC and compacting with Smooth wheel roller to achieve the desired density complete as per Technical Specification Clouse 401 | 180 | Cum. | 2,497.93 | ₹4,49,627.4 |
| 3 | Providing, laying, spreading and compacting Stone aggregates of specific sizes to Water Bound Macadam (WBM-G-III) specification incl spreading in uniform thickness, hand packing , rolling with three wheel 80-100kN static roller in stage to proper grade and camber , applying and brooming , crushable screening to fill up the interstices of coarse aggregate , watering and compacting tothe required density Grading 3 as per Technical Specification Clause 405. | 135 | Cum. | 3,163.03 | ₹4,27,009.05 |
| 4 | Laying of N.P.3 600 MM Dia Hume Pipe | 5 | Rmt | 2,915.08 | ₹14,575.4 |
| 5 | Concrete with 4cm. Guage Stone ballast fine sand of 2.20 F:M. and cement in proportion of 12:6:1 in foundation, Sub base and under floors including supply of all meterials, labour and T&P etc. required for proper completion of work.S.I.No 281(a)+New(Rate As per S.O.R.- Rampur Circle).(Rate sanction As Per S.E. Moradabad Letter No 613 /29-09-2025, Item No-02) | 13.11 | Cum. | 5,006.5 | ₹65,635.22 |
| 6 | M-150 brick work in 1:4 (one cement and Four coarse sand of 1.25 F.M.mortar) in foundation and plinth including supply of all meterials, labour and T&P etc. required for proper completion of work. S.I. No. 305 | 40.2 | Cum. | 4,854.5 | ₹1,95,150.9 |
| 7 | 12 MM thick Plaster with one part of cement and four part of approved corse sand mortar 2.25 fm over brick work including supply of all marerial labour taxes T&P etc. Required for proper completion of the work S.I.no. 584 | 174.8 | SQM | 193.8 | ₹33,876.24 |
| 8 | Cement Concrete with 2cm. guage approved stone grit coarse sand and cement in proportion of 4:2:1 including supply of all materials,labour and T&P etc. required for proper completion of work. S.I. No. 279A | 4.37 | Cum. | 7,220 | ₹31,551.4 |
| 9 | Providing and laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawing and Technical Specification Clause 1504. | 1,800 | SQM | 949.24 | ₹17,08,632 |
| 10 | Construction of information piller in brick work with Black Granite stone(2x3) size with B/W in 1:4 in 1.40m.wide wall,23 to 35 cm thickness & 1.50m. Height above G.L. with plaster in 1:4 as per drawing attached I/C digging & painting of letters ,snowcem two coats & I/C all materials,Labour &T&P etc. Complete. | 2 | NOS | 8,550 | ₹17,100 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
BOQ_2135821.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .