| # | Company | Amount |
|---|---|---|
| 1 | ₹12.2 L |
Tender Value
₹12.3 L
EMD Value
₹25,600
Closing Date
24 Jul 2026, 3:00 pmClosed
Richa Priyadrshani
Executive Officer
Punpun, Patna
Richa Priyadrshani
Executive Officer
Construction of PCC Road & RCC Drain with cover from House of Niwas Singh to House of Indu Singh in Ward No- 05
136118
SHNIT-08/2026-27/GR-09
Open Tender
CIVIL
Gaya
• COPY OF GST
• COPY OF PAN
• COPY REGISTRATION
• AFFIDAVIT
CIVIL
PERCENTAGE
L1
1
6 documents required · 6 mandatory
₹2,500
Processing Fee: 1180
₹25,600
EO CHAMBER N.P. SHERGHATI
1 Oct 2026
15 Jul 2026
24 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
18 Jul 2026
BILL OF QUANTITY
1 Name of Work नगर परिषद् शेरघाटी अंतर्गत वार्ड संख्या-5 समोद बिगहा में निवास सिंह के घर से इंदु सिंह के घर तक आरसीसी नाली एवं पीसीसी सड़क निर्माण |
2 Estimated Cost 1225800
3 Cost of BOQ 2500
4 Amount of Earnest Money 25600
5 Bid Processing Fee (Through Online Payment) According to eproc-2
6 Time of Completion 3 Month
S.No S.O.R Items of Work Qty. Unit Rate Amount Drain P.C.C
1 15.2.1 BCD Demolishing cement concrete including disposal of material within 50 metre lead: 1:3:6 or richer mix 29.44 cum 970.90 28,582.57 13.08 16.36
2 15.25 BCD Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material within 50 metres lead. 22.30 cum 535.60 11,945.20 9.91 12.39
3 15.3 BCD Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material withing 50 metres lead: 19.82 cum 1411.30 27,978.19 19.82
4 15.7.4 BCD Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 meters lead: 18.80 cum 823.70 15,489.57 18.80
5 2.8.1 BCD Earth work in excavation in foundation in trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan ) including dressing of sides and ramming of bottoms , lift upto 1.5 m . Including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m . ALL Kinds of soil. 77.15 Cum 360.70 27,826.30 77.15
6 2.25(A) Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead. 0.00 cun 411.70 0.00 0.00
7 2.28 BCD Providing supplying and Filling in plinth with local sand and under floors including , watering , ramming consolidating and dressing complete . 26.25 Cum 287.30 7,542.54 8.50 17.76
8 11.74 BCD Providing designation 100 B one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, but excluding carriage cost of bricks & sand 111.52 Sqm 267.70 29,855.02 111.52
9 16.78.2 BCD Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. 22.38 cum 1239.40 27,743.47 22.38
10 4.1.3 BCD Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4 ( 1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 26.90 Cum 3998.10 107,567.12 26.90
11 5.1.2 BCD Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring , shuttring , finishing and reinforcement - All work upto plinth level . In 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size ) 56.64 Cum 4688.30 265,550.84 56.64
12 5.22.7B BCD Providing Reinforcement for R.C.C work including straightening , cutting , bending , placing in position and binding all complete . Thermo-Mechanically Treated bars TMT Fe-500-10 mm dia. 4538.29 kg 92.60 420,246.05 4538.29
13 5.9.1 BCD Providing centring and shuttring including strutting , propping etc. and removal of form for foundation , footings , bases of columns etc. for mss concrete. 481.45 Sqm 211.60 101,873.87 446.10 35.35
14 2.26 BCD Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering . 19.29 Cum 123.90 2,389.58 19.29
Total Rs 1,074,590.33
Additional G.S.T @ 5.36% Rs 57,598.04
15 Carriage of Material MATERIALS
(iii) Local sand (Fine sand) 27.93 m3 326.61 9,120.93 10.17 17.76
(v) Cement (अभियंता प्रमुख-सह-विशेष सचिव ,पटना का ज्ञापांक-1626 दिनांक-29.04.2025) 31.27 MT 491.71 0.00 22.65647125 8.61
(vi) Steel (अभियंता प्रमुख-सह-विशेष सचिव ,पटना का ज्ञापांक-1626 दिनांक-29.04.2025) 4.538 MT 491.71 0.00 4.538
16 Seigniorage fee
(i) Bricks 3.598 Thous. 485.20 1,745.64
(ii) Coarse Sand 36.05 m3 17.58 633.67
(iii) Local sand (Fine sand) 27.93 m3 14.185 396.13
(iv) Stone chips 72.09 m3 59.536 4,291.95
SIGNBOARD AND PHOTOGRAPH Rs 5,000.00
Grand Total Rs 1,225,795.42
U.D.Div.-2, Gaya U.D.Div.-2, Gaya U.D.Div.-2,Gaya
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
nit 08.pdf
NIT • 3.94 MB
nit 08.pdf
NIT • 3.94 MB
GR09.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .