| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.3 LAdmitted-Finance G II 3 ELDECO ESTATE ONE G T ROAD SECTOR 6 PANIPAT PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | -29.11% | ₹15.3 L | L1 | Admitted-Finance |
| 2 | L2₹16.9 L+₹1.6 L (10.7%)Admitted-Finance | -21.55% | ₹16.9 L+₹1.6 L (10.7%) | L2 | Admitted-Finance |
Tender Value
₹21.5 L
EMD Value
₹43,082
Closing Date
28 Jul 2026, 11:00 amClosed
Executive Engineer/Sports Division-1
The Executive Engineer, Sports Division-1, Siri Fort Sports Complex, New Delhi - 110049
Laying Kota Stone and Maple Wood flooring in Badminton Court at DDA Roshanara Club.
2026_DDA_918519_1
19/EE/Sports Divn.-1/DDA/2026-27
Open Tender
Civil Works
Works
45 days
The Executive Engineer, SD-1, Siri Fort Sports Com
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹43,082
5 Aug 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more | 63.55 | cum | 494.1 | ₹31,400.06 |
| 2 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 122.59 | litre | 234.75 | ₹28,778 |
| 3 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration | 220.67 | sqm | 310.05 | ₹68,418.73 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.6 | cum | 7,294.7 | ₹2,23,217.82 |
| 5 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick | 306 | sqm | 1,948.25 | ₹5,96,164.5 |
| 6 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 63.55 | cum | 2,434.25 | ₹1,54,696.59 |
| 7 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 85.33 | sqm | 266.45 | ₹22,736.18 |
| 8 | Dismantling the existing hard maple wood badminton court flooring system, including surface court planks, perimeter transition reducer Subfloor components (including plywood layers, sleeper tracks, resilient rubber cushion pads, and vapor barriers). The work shall be Dismanting the existing hard maple wood badminton court fooring system, including surface court planks, perimeter tansion retiucor Cutting lush all nails, cleats, and fasteners, sorting and cleaning the dismantled materials from dust or adhesives; and neatly stackine SDecialized tools to minimize damage to the tongue-andgroove joints, avoiding splitting or splintering of themaple timber. Rate inclucde maple planks and subfloor materials at a designated location on site within a lead of 50 meters as directed by the Engineer-in-Charge. | 220.67 | sqm | 77.75 | ₹17,157.09 |
| 9 | Re-fixing of Hard maple wood tongue and grooved planks - supported by pine/spruce/fir padded runners of section 63.5mm x 38mm placed with distance between the runner to be 9 along the width of the court, Imported safe sleeper shock absorption pads of 8 mm thick be be provided under the runners for shock absorption. A vapor barrier of 1000 micron will also be introduced between sub floor and frame work. The frame will be duly fastened to the sub floor with the aid of clamps. The floor will be duly levelled with three pahse machine grinding, joint sealing with French chalk and sanding sealer followed by polishing with polyunethane finish. Also the work includes painting of game lines in required colors/dimensions . | 55.17 | sqm | 1,107.4 | ₹61,095.26 |
| 10 | Providing and fixing of 20mm (thickness) x 57mm (width) imported Hard maple wood tongue and grooved planks - BWF approved supported by pine/spruce/fir padded runners duly treated with wood life anti treatment of section 63.5mm x 38mm placed with distance between the runner to be 9" along the width of the court, Imported safe sleeper shock absorption pads of 8 mm thick be be provided under the runners for shock absorption. A vapor barrier of 1000 micron will also be introduced between sub floor and frame work. The frame will be duly fastened to the sub floor with the aid of clamps. The floor will be duly levelled with three phase machine grinding, joint sealing with French chalk and sanding sealer followed by polishing with polyurethane finish (of BWF approved manufacturer/flooring system).Also the work includes painting of game lines in required clours/dimensions and anti-termite treatment of concrete floor base (anti termite work for outer walls shall be paid separately). | 165.5 | sqm | 5,511.1 | ₹9,12,087.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.59 MB
BOQ_965262.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .