Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC 39B IBRAHIMPUR ROAD JADAVPUR KOLKATA WEST BENGAL 700032 | KOLKATA | KOLKATA | WEST BENGAL | 700032 | 1 | Accepted-AOC L1 | |
| 2 | 2₹17.9 L+₹7.9 L (79.2%)Rejected-Finance 6TH FLOOR R 6 HIMALAYA TANISHQ MEERUT ROAD RAJNAGAR EXTENSION GHAZIABAD UTTAR PRADESH 201017 | GHAZIABAD | UTTAR PRADESH | 201017 | 2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical 7 4 GANGAIAMMAN KOIL FIRST STREET VADAPALANI CHENNAI TAMIL NADU 600026 | CHENNAI | TAMIL NADU | 600026 | - | Rejected-Technical not qualified | |
| 4 | Rejected-Technical 149 LANE NO 11 SOCIETY AREA OPP TO GRAPHICS ERA UNIVERSITY STAFF QUATERS CLEMENT TOWN DEHRADUN UTTARAKHAND 248002 | DEHRADUN | UTTARAKHAND | 248002 | - | Rejected-Technical not qualified | |
| 5 | Rejected-Technical CHENNAI | CHENNAI | TAMIL NADU | 600001 | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | Enigma Control & Solution Private Limited L2 | SAURYAJYOTI RENEWABLES PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Design, Supply, Fabrication, Installation, Testing & Commissioning of Solar Tree using photovoltaic panels with Comprehensive Operation & Maintenance for a period of five years including 2 years free guarantee period. | 1 | Set | 11,20,000 ₹11,20,000 | 8,03,766 ₹8,03,766 Lowest |
| 2.00 | Third year Comprehensive AMC of the solar tree including supervision / monitoring of automated operation including
deployment of necessary manpower & facilities | 1 | Set | 2,00,000 ₹2,00,000 | 60,000 ₹60,000 Lowest |
| 3.00 | Fourth year Comprehensive AMC of the solar tree including supervision / monitoring of automated operation including
deployment of necessary manpower & facilities | 1 | Set | 2,20,000 ₹2,20,000 | 65,000 ₹65,000 Lowest |
| 4.00 | Fifth year Comprehensive AMC of the soalr tree including supervision / monitoring of automated operation including
deployment of necessary manpower & facilities | 1 | Set | 2,50,000 ₹2,50,000 | 70,000 ₹70,000 Lowest |
Tender Value
₹12.2 L
EMD Value
₹24,500
Closing Date
1 Sept 2025, 3:00 pmClosed
CME, VOCPA
Chief Mechanical Engineer VO Chidambaranar Port Authority Harbour Estate Tuticorin 628 004 Tamil Nadu
Supply and installation of 1 No of 5KW On grid Solar tree at VOCPA including Comprehensive Operation and Maintenance for a period of five years including 2 years
2025_VOCPT_245244_1
MEE-EE-PM-7200-2025-01
Open Tender
Electrical Works
Lump-sum
120 days
VOCPA, thoothukudi
Tender
14 documents required · 14 mandatory
₹0
₹24,500
Yes
28 Nov 2025
14 Aug 2025
2 Sept 2025
14 Aug 2025
1 Sept 2025
14 Aug 2025
Amount
Design, Supply, Fabrication, Installation, Testing & Commissioning of Solar Tree using photovoltaic panels with Comprehensive Operation & Maintenance for a period of five years including 2 years free guarantee period.
Third year Comprehensive AMC of the solar tree including supervision / monitoring of automated operation including deployment of necessary manpower & facilities
Fourth year Comprehensive AMC of the solar tree including supervision / monitoring of automated operation including deployment of necessary manpower & facilities
Fifth year Comprehensive AMC of the soalr tree including supervision / monitoring of automated operation including deployment of necessary manpower & facilities
Enigma Control & Solution Private Limited (BID ID -894474)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .