| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Kumarithankam woks contract L1 |
|---|---|---|---|---|
| 1.01 | Loading & unloading charges of all RCC ,REC pole above 8.0 Mts length | 189 | Per pole | 75,600 ₹75,600 Lowest |
| 2.01 | Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Above 8m pole) | 189 | Per pole | 94,500 ₹94,500 Lowest |
| 3.01 | Excavation of pole pit in Rocky area (cmmon to all size of poles) by blasting / Manual | 189 | Per pit | 2,07,900 ₹2,07,900 Lowest |
| 4.01 | Erection of RCC,REC,PSC pole above 8.0 Mts length by using Crane/manual | 189 | Per pole | 1,13,400 ₹1,13,400 Lowest |
| 5.01 | Loading & unloading charges of all RCC ,REC pole upto 8.0 Mts length | 12 | Per pole | 3,600 ₹3,600 Lowest |
| 6.01 | Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Up to 8m pole) | 12 | Per pole | 6,000 ₹6,000 Lowest |
| 7.01 | Excavation of pole pit upto 8.0 mts length by using JCB/Manual | 12 | Per pit | 4,800 ₹4,800 Lowest |
| 8.01 | Erection of RCC,REC,PSC pole upto 8.0 Mts length by using Crane/manual | 12 | Per pole | 5,400 ₹5,400 Lowest |
| 9.01 | Fixing of 3Q X arm | 130 | Per | 19,500 ₹19,500 Lowest |
| 10.01 | Fixing of SQ X arm | 130 | Per | 16,250 ₹16,250 Lowest |
Tender Value
Refer Docs
EMD Value
₹24,915
Closing Date
14 May 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
superintending Engineer
TNEB/Nagercoi
improving low voltage at Erathancode area of Valanoor Vayalinkarai SS 100KVA by providing 1 no additional 25 KVA DT under Sooriyacode section C and I PKD in Kuzhithurai Division in KKEDC
2025_EB_552746_1
KKEDC/ET-29/25,dt.29.04.2025
Open Tender
Electrical Works
Works
90 days
O/o thesuperintending Engine
As specified in tender
3 documents required · 3 mandatory
₹0
₹24,915
Yes
10 Oct 2025
29 Apr 2025
15 May 2025
30 Apr 2025
14 May 2025
30 Apr 2025
30 Apr 2025 - 13 May 2025
Loading & unloading charges of all RCC ,REC pole above 8.0 Mts length
Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Above 8m pole)
Excavation of pole pit in Rocky area (cmmon to all size of poles) by blasting / Manual
Erection of RCC,REC,PSC pole above 8.0 Mts length by using Crane/manual
Loading & unloading charges of all RCC ,REC pole upto 8.0 Mts length
Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Up to 8m pole)
Excavation of pole pit upto 8.0 mts length by using JCB/Manual
Erection of RCC,REC,PSC pole upto 8.0 Mts length by using Crane/manual
Fixing of 3Q X arm
Fixing of SQ X arm
Fixing of V X arm 3 .5 feet
Fixing of Taping Channel X Arm
Fixing of HT/LT 'TI' Fittings
Dismantling & Re-Erection of 3Q Xarm
Dismantling & Re-Erection of SQ X arm
Dismantling & Re-Erection of V Xarm
Dismantling & Re-Erection of Taping Channel X Arm
Dismantling & Re Fixing of HT/LT 'TI' Fittings
Fixing of HT Pin Insulater
Fixing of LT Pin Insulater
Fixing of HT Disc Insulater
Fixing of Lt shackle
Fixing of Aluminium knob
Dismantling & Re Fixing of HT Pin Insulater
Dismantling & Re Fixing of LT Pin Insulater
Dismantling & Re Fixing of HT Disc Insulater
Dismantling & Re Fixing of Lt shackle
Dismantling & Re Fixing of Aluminium knob
Dis & Redoing of S phase connection
Dis & Redoing of 3 phase connection
Dismantiling Re-Erection of 1*40 W tube light cmplete set
Street light switching point arrangement
Dismantling & Re-Erection of street light switching point arrangement
Erection of stay set complete in the rocky area by blasting
Dismantling and re Erection of stay set complete
Dismantling & Re Erection of stay set complete of stay pit of 4.5 depth (50% of original erection charges)
Paving & Stringing of conductor 7/4.09 mm ACSR
Paving & Stringing of conductor of above 7/2.59 mm ACSR up to 7/3.35 mm ACSR
Paving & Stringing of conductor up to 7/2.59 mm ACSR or other equivalent conductor
Dismantling &Re Stringing of conductor 7/4.09 mm ACSR
Dismantling & Re erection of conductor of above 7/2.59 mm ACSR up to 7/3.35 mm ACSR
Dismantling & Re erection of conductor up to 7/2.59 mm ACSR or other equivalent conductor
Dismantling & Re erection of split newtral gaurding
Erection of 11 KV single pole Structere including erection of DT complete without center support
Erection of 11 KV single pole Structere including erection of DT complete with center support
Loadind & un loading of Distribution Transformer up to 25 KVA
Transporting of Distribution Transformer up to 25 KVA
Erection of Distribution Transformer Above 25 KVA to 100KVA
Loadind & un loading of Distribution Transformer Above 25 KVA to 100KVA
Transporting of Distribution Transformer Above 25 KVA to 100KVA
Set right of all sizes of leaning pole
Loading & unloading of line materials
Transporting of distn transformer/ line materials from store to office /site up to 10 km distance by enqaging
Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes
OrdinaryTree Clearance
Coconut Tree Clearance
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .