Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹1.6 Cr+₹24.2 L (17.8%)Rejected-Finance DOOR NO 43 2 BESIDES VIZAG DEFENCE ACADEMY 104 AREA KAPPARADA VISAKHAPATNAM 530013 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530013 | ₹1.6 Cr+₹24.2 L (17.8%) | L2 | Rejected-Finance Other than L1 |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
4 Aug 2022, 6:00 pmClosed
CWE (ARMY) SECUNDERABAD
CWE (ARMY) MUDFORT COMPLEX, SECUNDERABAD- 500003
AUGMENTATION OF WATER SUPPLY TO IMPROVE STORAGE CAPACITY AT 36 JCOS ACCN AT SAFILGUDA UNDER GE(U) SECUNDERABAD
2022_MES_529383_1
CWE(S)/NORTH/TOKEN-04 OF 2022-2023
Open Tender
Civil Works - Others
Lump-sum
270 days
Secunderabad
As per NIT
7 documents required · 7 mandatory
₹1,000
GE(Utility)Secunderabad
₹2.2 L
Yes
10 Oct 2022
8 Jun 2022
11 Aug 2022
8 Jun 2022
4 Aug 2022
13 Jul 2022
Amount
Schedule 'A' Part I This Schedule is not pre-priced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Col 7.
Lump sum price worked out by the tenderer for "Construction of pump house with permanent specification in single storey for plinth area 25 sqm with load bearing PCC block masonry including ATT, WPT, pressed steel door frames/factory made paneled shutter, Rolling shutter, steel window etc complete all as shown on TD drawings as specified and directed " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the tenderer for "Construction of RCC under sump for 1,00,000 lit capacity with permanent specification with RCC framed structure, PCC blocks masonry including inlet, outlet and overflow pips etc complete complete all as shown on TD drawings as specified and directed " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIC SUPPLY” as listed in Schedule ‘A’ Part-II Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 11,952.38 inserted by the MES in Schedule ‘A’ Part-II
Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY ” as listed in Schedule ‘A’ Part-III Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs 19,88,812.06 inserted by the MES in Schedule ‘A’ Part-III
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VII Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.14,29,675.85 inserted by the MES in Schedule ‘A’ Part-IV
Schedule 'A' Part V (MISCELLANEOUS) This Schedule is not prepriced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Column 7. This Schedule consists of items Serially numbered as 5.01 to 5.46
Rate for item No. 01 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 02 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 03 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 04 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 05 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 06 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 07 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 08 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 09 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 10 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 11 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 12 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 13 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 14 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 15 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 16 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No.17 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 18 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 19 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 20 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 21 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 22 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 23 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 24 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 25 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 26 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 27 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 28 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 29 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 30 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 31 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 32(a) as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 32(b) as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 32(c) as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 33(a) as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 34 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 35 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 36 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 37 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 38(a) as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 39 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 40 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 41 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 42 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 43 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Rate for item No. 44 as listed in Schedule 'A' Part -V (MISCELLANEOUS)
Mavee Syndicate
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .