| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.0 LAdmitted-Finance | ₹5.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S EVERGREEN TRADERS L1 | Riya Electricals L2 | chauhan enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00Carriage of following materials from Electricity store center Unnao to dump work site along with loading, unloading and proper stocking as per requirement. Distance 0-70 Km. | ||||||
| 1.01 | PCC Pole 8.5 mtr Long and ST Pole 9/11 Mtr. Long | 40 | Nos | 1,200 ₹48,000 | 1,000 ₹40,000 | 1,150 ₹46,000 |
| 1.02 | 33/11 KV XLPE Cables of diff. size | 30 | Mtr | 200 ₹6,000 | 30 ₹900 | 195 ₹5,850 |
| 1.03 | 33/11 KV Jointing Kits of diff. size | 10 | Nos | 500 ₹5,000 | 300 ₹3,000 | 550 ₹5,500 |
| 2.00 | Loading Carriage and unloading of CT/PT unit from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. | 2 | Nos | 3,000 ₹6,000 | 1,800 ₹3,600 | 3,200 ₹6,400 |
| 3.00 | Carriage all type loose line material from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. | 10 | Job | 3,500 ₹35,000 | 2,450 ₹24,500 | 3,300 ₹33,000 |
| 4.00 | Dismantling of old damaged pole/double pole and X-arms, brackets, insulators channels and all hardware fitting. | 30 | Nos | 1,500 ₹45,000 | 1,800 ₹54,000 | 1,450 ₹43,500 |
| 5.00 | Erection of new PCC/ST pole for fitting of X-Arms, brackets insulators and other hardware fittings. | 30 | Nos | 3,000 ₹90,000 | 1,500 ₹45,000 | 2,800 ₹84,000 |
| 6.00 | Erection of Double Pole structure including digging of pit and fitting of all accessories complete. | 5 | Nos | 5,000 ₹25,000 | 2,650 ₹13,250 | 5,200 ₹26,000 |
| 7.00 | Placement of 10/16 KVA T/F & 25/63/100 KVA Transformer on Existing damage single /Double pole and Re-Installation and commissioning old T/F on new single/double pole in same place including dressing damaged cable, lugs, jumping & connecting Earthing of body & neutral as per required. | 4 | Nos | 4,200 ₹16,800 | 5,500 ₹22,000 | 4,000 ₹16,000 |
Updated dates
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Mar 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
QUANTUM OF WORK shedule of maintenance and attending breckdown 33/11/0.4 KV line of 33/11 KV Sudstation Ajgain and Sohramau, EDSD-I, Ajgain under the area of Electricity Distribution Division-V, Hasanganj, Unnao.
2026_MVVNL_1117149_1
139/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
365 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/CNo.3355002101008374,IFSCCodePUNB0335500
₹5,000
4 Apr 2026
17 Feb 2026
19 Mar 2026
17 Feb 2026
18 Mar 2026
17 Feb 2026
Carriage of following materials from Electricity store center Unnao to dump work site along with loading, unloading and proper stocking as per requirement. Distance 0-70 Km.
PCC Pole 8.5 mtr Long and ST Pole 9/11 Mtr. Long
33/11 KV XLPE Cables of diff. size
33/11 KV Jointing Kits of diff. size
Loading Carriage and unloading of CT/PT unit from ESC store Unnao/Sub station store/other site to site work as per required and vice versa.
Carriage all type loose line material from ESC store Unnao/Sub station store/other site to site work as per required and vice versa.
Dismantling of old damaged pole/double pole and X-arms, brackets, insulators channels and all hardware fitting.
Erection of new PCC/ST pole for fitting of X-Arms, brackets insulators and other hardware fittings.
Erection of Double Pole structure including digging of pit and fitting of all accessories complete.
Placement of 10/16 KVA T/F & 25/63/100 KVA Transformer on Existing damage single /Double pole and Re-Installation and commissioning old T/F on new single/double pole in same place including dressing damaged cable, lugs, jumping & connecting Earthing of body & neutral as per required.
Dismantling re-usable old damaged pole/double pole and X-arms, brackets, insulators channels and all hardware fitting etc.
Dismantling /Laying/Repairing of repairing of aerial bunched cable from L.T.O.H. line ( To be replace/damaged)
Dismantling of old 11 KV/L.T. line including rolling back its conductor from work site to dump site
After locating of fault repairing the 33/11 KV XLPE Cable U/G of diff. size with providing ST Jointing kits as required (only Jointing kits and cable shall be provided by Department. Digging of soil at fault location and cleaning of faulty section cable then proper leveling the ground and resume supply.
Opening and reconnection of consumer connections for shifting of replacement of pole.
Re-sagging of conductor, on old line after erection/repair of pole, binding of conductor etc.
Opening of H.T./L.T. jumpers/Re-jumpering from the existing H.T.O.H./L.T.O.H. line erection work.
Replacement and Installation testing and commissioning New/old 11 KV/33 KV CT/PT unit and all related work.
Providing and fixing holding clamps for PCC/STP with nuts & Bolts
Providing and fixing Stay/LT clamps for PCC/STP with nuts & Bolts
Providing and fixing F clamps for PCC/STP with nuts & Bolts
Providing and fixing LT Shackle Insulator with nuts & Bolts
Making & fixing of cable box for 11 KV 3x70 to 3x300 mm2 for XLPE cable (Jointing Kit/Cbale box/ O/D and I/D cable box providing by department)
Grouting of pole with cement brick ballast and coarse sand as per standard specifications.
Repositioning of tilted PCC/ST pole
Fabrication/Modification of MS items /nuts & bolt as per requirement of site condition.
Fixing of stay rod and its erection and grouting by fitting of stay clamp, stay wire and its proper binding and tighting etc.
Chopping of tree branches lying in te route of existing line touching the tree branches to the phase line conductor as per requirements of site.
Carriage of old conductor scrap from work site to substation dump site with loading unloading and proper placing
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
DOC139.pdf
Tender Documents • 1.39 MB
BOQ_2075471.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid