| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC | ₹18.3 L | L1 | Accepted-AOC Award the work |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Kamalam Construction L1 |
|---|---|---|---|---|
| 1.00Material and Labour Charges | ||||
| 1.01 | Clearing light jungles including uprooting and removing the jungles away from the site including labour charges,tools, lead, lift,etc.,complete. | 300 | M2 | 1,725 ₹2,035.5 Lowest |
| 1.02 | Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth including labour and tools etc., complete. | 193 | M3 | 14,197.08 ₹16,752.55 Lowest |
| 1.03 | Supply and Filling with Msand for foundation and basement including cost of filling M-sand lead, lift, labour for filling, watering, well ramming etc., complete. | 13 | M3 | 20,895.94 ₹24,657.21 Lowest |
| 1.04 | Plain cement concrete (PCC)1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete as per standard specification. | 17 | M3 | 84,559.7 ₹99,780.45 Lowest |
| 1.05 | Reinforced cement concrete(RCC Raft works)with M25 (1:1:2) grade concrete using 12 to 20 mm HBG machine crushed metal including cost of cement, all materials, labour, laying, finishing, all leads, lifts, etc., complete. (but excluding cost of shuttering and steel reinforcement.) | 65 | M3 | 4,90,266.4 ₹5,78,514.35 Lowest |
| 1.06 | Reinforced cement concrete RCC with M25 (1:1:2) grade concrete, using 12 mm to 20mm HBS metal (machine crushed) for RCC wall with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete (but excluding cost of steel reinforcement). | 22 | M3 | 3,21,805.66 ₹3,79,730.68 Lowest |
| 1.07 | Supplying and fabricating and placing in position of RTS steel reinforcement (Fe500) for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete. | 6.69 | Ton | 5,16,864.11 ₹6,09,899.65 Lowest |
| 1.08 | Refilling with excavated soil (other than sand) for filling in foundation and basement including cost of filling excavated soil lead, lift, labour for filling, watering, well ramming etc., complete. | 16 | M3 | 614.56 ₹725.18 Lowest |
| 1.09 | Spreeding and levelling the excavated soil in layer of not more than 15cm thick for a level surface in the yard including cost of filling excavated soil, Consolidated by using power roller (hire charges for machineries) watering, well ramming, lead, lift, labour for filling,etc., complete. | 177 | M3 | 13,597.14 ₹16,044.63 Lowest |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
28 Nov 2025, 2:00 pmClosed
SE/VEDC/Villupuram
No10 Power house road Villupuram
Construction of 1 No (Tank 1) twin type RCC curing tank for curing 9.0 m PSC Pole at Poothamedu PSC yard in Villupuram EDC
2025_EB_623389_1
ET08/2025-26 dt.13.11.2025
Open Tender
Civil Works
Works
180 days
villupuram
EMD,GST,EPF and BQR requirements
2 documents required · 2 mandatory
₹100
Yes
₹23,000
Yes
18 Sept 2026
14 Nov 2025
29 Nov 2025
14 Nov 2025
28 Nov 2025
14 Nov 2025
Material and Labour Charges
Clearing light jungles including uprooting and removing the jungles away from the site including labour charges,tools, lead, lift,etc.,complete.
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth including labour and tools etc., complete.
Supply and Filling with Msand for foundation and basement including cost of filling M-sand lead, lift, labour for filling, watering, well ramming etc., complete.
Plain cement concrete (PCC)1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete as per standard specification.
Reinforced cement concrete(RCC Raft works)with M25 (1:1:2) grade concrete using 12 to 20 mm HBG machine crushed metal including cost of cement, all materials, labour, laying, finishing, all leads, lifts, etc., complete. (but excluding cost of shuttering and steel reinforcement.)
Reinforced cement concrete RCC with M25 (1:1:2) grade concrete, using 12 mm to 20mm HBS metal (machine crushed) for RCC wall with formwork including cost of all materials, labour, lead, lift, centering shuttering , curing, etc., complete (but excluding cost of steel reinforcement).
Supplying and fabricating and placing in position of RTS steel reinforcement (Fe500) for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.
Refilling with excavated soil (other than sand) for filling in foundation and basement including cost of filling excavated soil lead, lift, labour for filling, watering, well ramming etc., complete.
Spreeding and levelling the excavated soil in layer of not more than 15cm thick for a level surface in the yard including cost of filling excavated soil, Consolidated by using power roller (hire charges for machineries) watering, well ramming, lead, lift, labour for filling,etc., complete.
Supplying, laying and jointing of 50mm PVC pipes (having working pressure 10 kg. / sq.cm) of approved quality and best variety conforming to BIS including cost of cutting, threading and fixing PVC specials using PVC adhesives ( including cost of such specials) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall, labor, lead,lift etc.,complete. (Below ground level).
Supplying and fixing in position first quality and approved variety of 50mm diaGun metal Gate Valve with BIS make including cost of shellac, thread balls, etc., complete complying with standard specifications.
Supplying, laying and jointing of 40mm PVC pipes (having working pressure 10 kg. / sq.cm) of approved quality and best variety conforming to BIS including cost of cutting, threading and fixing PVC specials using PVC adhesives (including cost of such specials) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall, labor, lead,lift etc.,complete. (Below ground level).
Supplying and fixing in position first quality and approved variety of 40mm diaGun metal Gate Valve with BIS make including cost of shellac, thread balls, etc., complete complying with standard specifications
Supplying, laying and jointing of 100 mm PVC pipes (having working pressure 6 kg. / sq.cm) of approved quality and best variety conforming to BIS including cost of cutting, threading and fixing PVC specials using PVC adhesives (including cost of such specials) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall, labor, lead,lift etc.,complete. (Below ground level).
Supplying, laying and jointing 100mm GI pipes of approved quality and best variety of B Class pipes of the following dia including labour for fixing GI Specials (including charges for cutting and threading ) with necessary shellac, thread ball, etc., and making holes on the wall / concrete and making good the dismantled portion to the original condition with necessary brick work / concrete. T (The earth work excavation, re-filling the trench with excavated earth, crushed stone sandfilling, etc., shall be measured and paid separately under respective items). Below ground level
Supplying and fixing of 110 mm PVC Male Threaded Adopter in water drainage arrangements including cost of lead, lift,etc,complete
Supplying and fixing of 110mm PVC end cap threaded in water drainage arrangements including cost of lead, lift,etc,complete
Dewatering charges per hour including hire charges for 3/5 HP Diesal motor with Pump
White washing two coats with white cement with necessary whitening agent including cost of all materials, labour, lead and lift etc., complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_745408.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .